Reyes Construction Inc

is seeking certified and qualified HUD Section 3, SBE, SDVOSB, VOSB and WOSB subcontractors and/or suppliers to provide Subcontractors- Demolition, Survey, QAQC, Biologist, Liner Sub, Export Trucking Suppliers- LPSL/Leachate Collection and Removal, Geotextile, HDPE, Protective Cover Soil, PVC, Aggregates, Erosion Control Materials, Rebar, Clay


PROJECT NAME:

Las Pulgas Landfill Corrective Action Plan Implementation Phase I Liner Reconstruction and Phase II

BID CONTRACT #:

N62473-24-R-1201

AWARDING AGENCY:

NAVFAC Southwest

PROJECT LOCATION:

Las Pulgas Landfill at Camp Pendleton, San Diego,CA, CA, 92058

BID DUE DATE:

07-02-2026 at 02:00 PM

OUTREACH COORDINATOR:

Brenda Martinez

TELEPHONE:

909-622-2259

FAX:

Not Available

ADDRESS:

1383 South Signal Dr., Pomona, CA, 91766

PROJECT DETAILS:

Estimated Project Value: $10,000,000-$25,000,000

Project Scope:

This project, titled "Corrective Action Plan Implementation Phase I Liner Reconstruction and Phase II Liner Repairs" (Project No. PE20E10M, Contract No. N62473-24-R-1201), is located at the Las Pulgas Landfill, MCB Camp Pendleton, San Diego, California. Its primary objective is to remove the failed Phase I toe and slope liner systems, the compromised interface with the Phase II slope liner, the complete Leachate Collection and Removal System (LCRS), and the associated LCRS subdrain system. Following removal, these systems will be reconstructed in full compliance with the Corrective Action Plan (CAP), the San Diego Regional Water Quality Control Board (RWQCB) Waste Discharge Requirements, Order No. R9-2011-039, and California Code of Regulations (CCR) Title 27. The scope includes reconstructing the Phase I liner system (approximately 240,000 square feet) and repairing the Phase II area damaged during prior Phase I slope liner construction. The period of performance is 420 calendar days from task order award.

 

Assistance will be available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials or related technical assistance.

Reyes Construction, Inc. is signatory to the following unions: Teamsters, Operators, Cement Masons, Carpenters and Laborers.

For information on the availability of scope of work, plans, and specifications, please contact our office. 

Plans, Specifications, and Contract requirements can be viewed at no additional cost:

  1. Via BuildingConnected – please send an email request to estimating@reyesconstruction.com
  2. In person at Reyes Construction Headquarters (please email for appointment) 

Please e-mail Questions and Quotes to: Estimating@reyesconstruction.com

 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.