is seeking certified and qualified City of San Francisco LBE subcontractors and/or suppliers to provide CONCRETE REPAIR CONCRETE FORMING AND ACCESSORIES CONCRETE REINFORCEMENT POST-INSTALLED CONCRETE ANCHORS PAINTING OF MECHANICAL EQUIPMENT HVAC AIR-DISTRIBUTION SYSTEM CLEANING COMMON WORK RESULTS FOR HVAC COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT TESTING, ADJUSTING, AND BALANCING FOR HVAC HVAC INSULATION HVAC DUCTS AND CASINGS FIBERGLASS REINFORCED PLASTIC DUCTS AIR DUCT ACCESSORIES HVAC FANS AIR OUTLETS AND INLETS COMMON WORK RESULTS FOR ELECTRICAL ELECTRICAL SELECTIVE DEMOLITION AND MODIFICATIONS LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PVC COATED GALVANIZED RIGID STEEL (PGRS) CONDUIT AND SYSTEM COMPONENTS IDENTIFICATION FOR ELECTRICAL SYSTEMS COMMISSIONING OF ELECTRICAL SYSTEMS LIGHTING CONTROL DEVICES DISCONNECT SWITCHES LED INTERIOR LIGHTING INSTRUMENTATION FOR PROCESS SYSTEM COMMON WORK RESULTS FOR INSTRUMENTATION AND CONTROL SYSTEM CONTROL STRATEGY
WW-770 Oceanside Water Pollution Control Plant HVAC
10037734
San Francisco Public Utilities Commission
3500 Great Highway, San Francisco, CA, 94132
05-14-2026 at 02:00 PM
Kelsey Heaphy
4154568972
415-459-0065
5400 Hanna Ranch Road, Novato, CA, 94945
PROJECT DETAILS:
Please submit bids to us before 2pm on bid day.
*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.
TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through Friday from 7:30 AM to 4:00 PM. Plans and specifications may be emailed upon request or downloaded from the following link:
https://tpcorp.box.com/s/195ywcd7rrqpqw04qfnd6kgbozh97jbv
Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Kelsey Heaphy
PHONE: (415) 456-8972 FAX: (415) 459-0665
EMAIL: bids@tbcorp.com