is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BIDS FOR THE CITY OF CHULA VISTA FIRE STATION NO. 11 Scope of work to include: Construction of a new Fire Station No. 11 for the City of Chula Vista. The station is a 11,790 sq. ft building, with 3 Apparatus bays, 10 Dormitories, Kitchen, Dining, Restrooms, Day Room, Exercise Room, Offices, Workshop, Storage, EMS, Fire Control Room, Data Room, Electrical Room, and other supporting spaces. Type-v wood frame construction, concrete tile roof and SBS roof. The station is equipped with mechanical, plumbing, electrical system, vehicle exhaust removal system, station alerting system, fire alarm system, and NFPA 13 automatic fire sprinkler system. The associated site improvement includes access road, drive approaches, paving, parking, trash enclosure, site walls, fence, gates, flagpole, monument sign, parking light standards, transformer, emergency generator, hose drying rack, propane tank, sand-oil interceptor, fire hydrants, underground utilities, and landscape, on a 3.5-acre lot.
Chula Vista Fire Station No. 11
Not Available
Erickson-Hall Construction Co.
1595 Santa Luna Street, Chula Vista, CA, 91913
05-08-2026 at 02:00 PM
Summer Lumpkin
760-796-7700
Not Available
500 Corporate Drive, Escondido, CA, 92029
PROJECT DETAILS:
RFI’s due: April 24, 2026; 2pm
Bid Date: May 8, 2026; 2pm
Lead Estimator: Nick Verdis
Project Address: 1595 Santa Luna Street, Chula Vista, CA 91913
Bid Documents can be obtained by visiting our BuildingConnected Portal or by contacting planroom@ericksonhall.com
All bids are to be submitted via Building Connected.
This project requires Prevailing Wage Rates
If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Erickson-Hall Construction Company requires all subcontractors submitting bids in excess of $50,000 to be prepared to furnish performance and payment bonds issued by a corporate security. Erickson-Hall Construction Company, at its sole discretion, reserves the right to waive this requirement or permit substitute security or alternate guarantees. We offer assistance in obtaining necessary equipment, supplies materials, bonds, lines of credit and insurance.
Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/Public-Works/publicworks.html. SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5).