is seeking certified and qualified HUD Section 3, MBE and WBE subcontractors and/or suppliers to provide WATER POLLUTION CONTROL PROGRAM, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, REMOVE & RELOCATE ROADSIDE SIGN, REMOVE EXISTING 8" CMP, ABANDON STORM DRAIN PIPE & FILL WITH GROUT, REMOVE ASPHALT CONCRETE PAVEMENT, ADJUST SEWER MANHOLE FRAME AND COVER TO GRADE, ADJUST WATER VALVE BOX FRAME AND COVER TO GRADE, CONSTRUCT TYPE A ASPHALT DIKE (PLACER COUNTY ST-26), CONSTRUCT TYPE E ASPHALT DIKE (PLACER COUNTY ST-26), CONSTRUCT MODIFIED SPEED HUMP, INSTALL 4" PVC -STORM DRAIN PIPE, INSTALL 6" NDS SPEE-D BASIN WITH DUCTILE IRON GRATE, BASIC CROSSWALK - PAVEMENT MARKING (CALTRANS STD. A24F), WHITE STOP BAR/LINE - PAVEMENT MARKING (CALTRANS STD. A24G), WHITE "STOP" - PAVEMENT MARKING (CALTRANS STD. A24D), THERMOPLASTIC PAVEMENT MARKINGS, YELLOW LINE, NO PASSING (CALTRANS STD DETAIL 21), HOT MIX ASPHALT (TYPE A), GRIND 6", INSTALL TENSAR 850 GEOGRID, INSTALL 6" AGGREGATE BASE, MOBILIZATION, MINOR CONCRETE (SIDEWALK), MINOR CONCRETE (CURB), REMOVE GRAVEL DRIVEWAY, MINOR CONCRETE (DRIVEWAY), CONSTRUCT TYPE E MODIFIED DOUBLE SIDE ASPHALT DIKE (PLACER COUNTY ST-26)
CDBG Road Rehabilitation Project 2026
Not Available
City of Colfax
Multiple Streets, Colfax, CA, 95713
04-16-2026 at 02:00 PM
Levi Hubbard
5308916555
5308946220
1764 Skyway, Chico, CA, 95928
PROJECT DETAILS:
Baldwin Contracting Company, Inc. dba Knife River Construction is bound by the Master Labor Agreement with the Laborers, Operating Engineers and Teamsters. If your company enters into a subcontract with Baldwin, portions of those Labor Agreements may be applicable to your scope of work.
Assistance is available to HUD Section 3, MBE, and WBE companies for obtaining bonding, lines of credit or insurance and any technical assistance related to the Plans and Specifications. In addition, assistance is available to obtain necessary equipment, supplies, materials or services. For your convenience, a set of Plans is available for review at our office.