is seeking certified and qualified HUD Section 3, MBE and WBE subcontractors and/or suppliers to provide Grind 10' taper 0.15' Min. Depth at Edges & Profile as Necessary, Pavement Repair (4" HMA), Geosynthetic Pavement Interlayer (Paving Fabric with Oil), Hot Mix Asphalt (HM A) (Type A) (2" Min. Overlay), Hot Mix Asphalt (HM A) (Type A) (2"" Min. Overlay with Leveling Course), Type II Slurry Seal, Accessible Ramp (Single Corner - Case A) D1, Accessible Ramp (Single Through - Case F) D2, Accessible Ramp (Double Through - Case F) D3, Accessible Ramp (Double Through - Case F with new DIs ) D3, Accessible Ramp (Double Corner - Case C) D7, Install Truncated Dome Mat in (E) Sidewalk / Ramp Area, Install HMA Speed Table After Overlay with Paving Markings and Waring Signs, Replace Commercial Driveway, Replace Minor Concrete (Curb and Gutter), Minor Concrete - Remove & Replace Sidewalk, Replace minor street approach including sidewalk & curb & gutter, Adjust Utility Manhole Covers to grade, Adjust Utility (Valve /Cleanout) Covers to grade, Adjust Drain Inlet to grade, Replace Drain Inlet, Adjust Centerline Monument Covers to grade (Protect monument in place), Remove Temporary Traffic Circle, Pavement Delineation ("STOP" Legend and Stop Bar), Pavement Delineation ("YIELD" Legend and line arrows), Pavement Delineation Crosswalk (Detail A24F - Ladder), Pavement Delineation (Detail 22 ), Pavement Delineation (Detail 39 / 39A), Pavement Delineation (2' wide Bike lane buffer - Detail 39 / Diagonal @ 6' O.C.), Pavement Delineation (Bike Lane Symbol w/ Arrow), Pavement Delineation (Bike Lane Share Arrow), Pavement Delineation (TYPE I, II, & II Arrows), Pavement Delineation - Diagonal Parking Lines, Bike Path Sign - 1 Post, Replace Street Name Signs 2 - 1 Post, Replace Street Name Sign - 1 Post, Replace Stop Sign - 1 Post, Replace Yield Sign - 1 Post, Replace Caltrans Signal Loops, Replace Caltrans Advanced Signal Loops
CDBG Pavement Rehabilitation - Phase 3 Project
24-10
City of Marysville
Multiple Streets, Marysville, CA, 95901
04-09-2026 at 01:30 PM
Levi Hubbard
5308916555
5308946220
1764 Skyway, Chico, CA, 95928
PROJECT DETAILS:
Baldwin Contracting Company, Inc. dba Knife River Construction is bound by the Master Labor Agreement with the Laborers, Operating Engineers and Teamsters. If your company enters into a subcontract with Baldwin, portions of those Labor Agreements may be applicable to your scope of work.
Assistance is available to HUD Section 3, MBE, and WBE companies for obtaining bonding, lines of credit or insurance and any technical assistance related to the Plans and Specifications. In addition, assistance is available to obtain necessary equipment, supplies, materials or services. For your convenience, a set of Plans is available for review at our office.