is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Concrete, Railings, Rough Carpentry, Finish Carpentry, Architectural Wood Casework, Fiberglass Reinforced Panels, Insulation, Roofing, Sheet Metal Flashing and Trim, Gutters and Downspouts, Joint Sealants, Doors Frames and Hardware, Access Doors and Panels, Flooring, Remedial Floor Coating, Drywall, Acoustical, Tackboards, Acoustical Stretched-Fabric Wall Systems, Painting, Visual Display Units, Signage, Specialties, Food Service Equipment, Assistive Listening Devices, Window Shades, Countertops, Plumbing, HVAC, Electrical, Communications, Fire Alarm, Earthwork, Asphalt Paving, Fence and gates, Utilities
C.L. Smith Elementary School Phase 2 Modernization Project
336
San Luis Coastal Unified School District
1375 Balboa St, San Luis Obispo, CA, 93401
04-27-2026 at 02:00 PM
Jessica Gregory
805-335-1161
805-614-9909
991 Bennett Avenue, Arroyo Grande, CA, 93420
PROJECT DETAILS:
Edwards Construction Group is currently pursuing the C. L. Smith Phase 2 Modernization Project with San Luis Coastal Unified School District.
The project includes the Modernization of bldg B, D, E, F, G
Please review the plans and specifications via Procore and let us know if you are interested in sending us your bid for this project.
This is a PREVAILING WAGE project.
THIS CONTRACT IS NOT SUBJECT TO THE DVBE REQUIREMENTS OF EDUCATION CODE SECTION 17076.11.
BID DATE - Please note that the listed due date and time is the time that all completed paperwork is due at the Bid Location. We request that all bids be sent to us no later than 1 hour before the time the bid is due to be considered.
Please call if you have any questions.
Thank you,
Jessica Gregory
Estimating Coordinator
Office: 805-335-1161
Direct: 805-699-6921
Fax: 805-614-9906
E-mail: jessica@weareedwards.com