Trade Journal

Thompson Builders Corporation

is seeking certified and qualified City of San Francisco LBE subcontractors and/or suppliers to provide SUMMARY OF WORK ACCESS TO SITE PRICE AND PAYMENT PROCEDURES MOBILIZATION ITEM PRODUCT SUBSTITUTION PROCEDURES SCHEDULE OF VALUES PROJECT MANAGEMENT AND COORDINATION PROJECT MEETINGS PARTNERING REQUIREMENTS THIRD-PARTY FACILITATOR AGREEMENT CONSTRUCTION PROGRESS SCHEDULE SUBMITTAL PROCEDURES BUILDING-RELATED HAZARDOUS MATERIALS REGULATORY REQUIREMENTS REFERENCES TEMPORARY FACILITIES AND CONTROLS FIELD OFFICES TEMPORARY NOISE AND VIBRATION CONTROLS PRODUCT REQUIREMENTS PROTECTION OF ADJACENT CONSTRUCTION SEISMIC REQUIREMENTS FOR MECHANICAL AND ELECTRICAL EQUIPMENT CUTTING AND PATCHING MATERIAL REDUCTION AND RECOVERY PLAN TESTING COORDINATION AND START-UP TESTING CLOSEOUT PROCEDURES OPERATIONS AND MAINTENANCE DATA CONCRETE FORMING AND ACCESSORIES CONCRETE REINFORCING CAST-IN-PLACE CONCRETE GROUTING POST-INSTALLED CONCRETE ANCHORS INTERIOR ARCHITECTURAL WOODWORK JOINT SEALANTS NON-STRUCTURAL METAL FRAMING GYPSUM BOARD ACOUSTICAL CEILINGS RESILIENT FLOORING PAINTING PAINTING OF MECHANICAL EQUIPMENT LABORATORY FUME HOODS GENERAL REQUIREMENTS FOR PLUMBING COMMON WORK RESULTS FOR PLUMBING HANGERS AND SUPPORTS FOR PLUMBING IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMEN PLUMBING INSULATION PLUMBING PIPING PLUMBING FIXTURES COMMON WORK RESULTS FOR HVAC COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMEN GENERAL DUTY VALVES FOR HVAC PIPING HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIP VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING A EQUIPMENT IDENTIFICATION OF HVAC PIPING, DUCTWORK AND EQU TESTING, ADJUSTING, AND BALANCING FOR HVAC HVAC INSULATION HYDRONIC SYSTEMS HVAC DUCTS AND CASINGS AIR DUCT ACCESSORIES HVAC FANS AIR OUTLETS AND INLETS COMMON WORK RESULTS FOR ELECTRICAL ELECTRICAL SELECTIVE DEMOLITION AND MODIFICATIONS LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PGRS CONDUIT AND SYSTEM COMPONENTS IDENTIFICATION FOR ELECTRICAL SYSTEMS OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY (AND ARC FLASH HAZARD ANALYSIS) COMMISSIONING OF ELECTRICAL SYSTEMS WIRING DEVICES ENCLOSED SWITCHES AND CIRCUIT BREAKERS ENCLOSED CONTROLLERS LOW VOLTAGE VARIABLE FREQUENCY DRIVES


PROJECT NAME:

Oceanside Water Pollution Control Plant 930 Administration and Lab Structure Health and Safety Improvements

BID CONTRACT #:

Contract No. WW-766

AWARDING AGENCY:

San Francisco Public Utilties Commission

PROJECT LOCATION:

3500 Great Highway, San Francisco, CA, 94132

BID DUE DATE:

04-16-2026 at 02:00 PM

OUTREACH COORDINATOR:

Kelsey Heaphy

TELEPHONE:

4154568972

FAX:

415-459-0665

ADDRESS:

5400 Hanna Ranch Road, Novato, CA, 94945

PROJECT DETAILS:

To Request Plans and Specs follow the steps below.

"To request these materials, email qbd@sfwater.org with this Contract No. WW-766, the firm name, full address, email address, phone number, 

copy of contractor’s license or business card, and a copy of a government-issued identification… Please be advised that prior to receiving these materials, all requestors 

will be required to complete, sign, and comply with a Confidentiality Agreement."

 

Please submit bids to us before 2PM on bid day.

 

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. 

 

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. 

 

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through Friday from 7:30 AM to 4:00 PM.  Plans and specifications may be emailed upon request or downloaded from the following link:  

 

https://tpcorp.box.com/s/5ssg4zwzqvp814rp6h04xuwrwyxu7zid

 

Thompson Builders Corporation is an Equal Opportunity Employer

 Contact:  Kelsey Heaphy 

PHONE: (415) 456-8972     FAX: (415) 459-0665

EMAIL:  bids@tbcorp.com

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.