Trade Journal

Giant Construction, Inc.

is seeking certified and qualified SBE subcontractors and/or suppliers to provide DIVISION 2 DEMOLITION Section 02 26 00 Abatement of Hazardous Materials 02 41 16 Selective Demolition DIVISION 3 Section CONCRETE 03 25 20 Anchors and Dowels in Resin 03 25 30 Expansion Anchors 03 25 40 Undercut Anchors 03 30 01 Cast-in-place Concrete 03 35 40 Polished Concrete Finishing 03 37 13 Shotcrete 03 54 16 Hydraulic Cement Underlayment DIVISION 4 Section MASONRY 04 23 00 Reinforced Concrete Masonry Units DIVISION 5 METALS 05 02 30 Metal Fastenings 05 12 00 Structural Steel 05 50 00 Metal Fabrications 05 52 13 Pipe & Tube Railings DIVISION 6 WOOD AND PLASTICS 06 10 00 Rough Carpentry 06 18 00 Glued-Laminated Construction 06 20 00 Finish Carpentry 06 41 00 Architectural Wood Casework DIVISION 7 THERMAL AND MOISTURE PROTECTION Section 07 13 00 Self-Adhered Sheet Waterproofing 07 21 00 Thermal Insulation 07 40 00 Metal Siding 07 41 13 Metal Roof Panels 07 54 19 PVC Roofing 07 62 00 Sheet Metal Flashing & Trim 07 72 33 Roof Hatches 07 84 00 Firestopping 07 92 00 Joint Sealants DIVISION 8 DOORS AND WINDOWS Section 08 11 13 Hollow Metal Doors & Frames 08 14 16 Flush Wood Doors 08 16 13 FRP Exterior Doors 08 31 16 Access Panels & Frames 08 33 10 Coiling Counter Doors 08 34 16 Hangar Doors 08 36 00 Aluminum Sectional Overhead Door 08 43 13 Aluminum-Framed Entrances & Storefronts 08 44 13 Glazed Aluminum Curtain Wall 08 51 13 Aluminum Windows 08 60 00 Unit Skylight 08 71 00 Door Hardware 08 80 00 Glazing 08 83 00 Mirrors DIVISION 9 FINISHES Section 09 05 16 Common Work Results for Flooring Preparation 09 22 16 Light Gage Metal Framing 09 24 23 Portland Cement Plastering 09 28 15 Tile Backing Board 09 29 00 Gypsum Board 09 30 00 Tiling 09 51 13 Acoustical Panel Ceilings 09 54 29 Wood Ceilings 09 65 00 Resilient Flooring 09 65 10 Rubber Flooring Stair Covering 09 65 14 Resilient Wall Base & Accessories 09 68 00 Carpeting 09 81 33 Acoustical Insulation, Sealants and Accessories 09 84 00 Felt Acoustic Baffles 09 90 00 Painting and Coatings 09 96 00 High Performance Coatings DIVISION 10 SPECIALTIES Section 10 11 00 Visual Display Cases & Display Boards 10 11 16 Marker Boards10 14 00 Interior Signage 10 14 13 Exterior Signage 10 21 13 Toilet Compartments 10 22 26 Operable Partition10 26 00 Wall Protection 10 28 00 Toilet Accessories 10 44 00 Fire Protection Specialties DIVISION 12 FURNISHINGS Section 12 24 13 Roller Window Shades manual roller shades shall comply with 11B-309. 09 96 56 Epoxy Flooring DIVISION 10 SPECIALTIES Section 10 11 00 Visual Display Cases & Display Boards 10 11 16 Marker Boards 10 14 00 Interior Signage 10 14 13 Exterior Signage 10 21 13 Toilet Compartments 10 22 26 Operable Partition 12 36 00 Countertops 12 48 16 Exterior Entrance Floor Grille 12 48 23 Interior Entrance Floor Mat DIVISION 14 CONVEYING EQUIPMENT Section 14 20 00 Elevator Renovations DIVISION 21 FIRE SUPPRESSION Section 21 05 00 Common Work Results For Fire Suppression 21 13 13 Wet-Pipe Sprinkler System DIVISION 22 PLUMBING Section 22 05 00 Common Work Results For Plumbing 22 05 19 Meters and Gauges for Plumbing Piping 22 05 23 General Duty Valves for Plumbing Piping 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 48 Vibration and Seismic Control for Plumbing Piping 22 07 00 Plumbing Insulation 22 11 16 Domestic Water Piping 22 13 16 Sanitary Waste and Vent Piping 22 30 00 Plumbing Equipment 22 40 00 Plumbing Fixtures DIVISION 23 MECHANICAL Section 23 05 00 Common Work Results for HVAC 23 05 13 Common Motor Requirements for HVAC 23 05 29 Hangers and Supports for HVAC Piping 23 05 48 Vibration and Seismic Control for HVAC Piping and Equipment 23 05 93 Testing, Adjusting and Balancing for HVAC 23 07 00 HVAC Insulation 23 31 13 Metal Ducts 23 33 00 Air Duct Accessories23 37 00 Air Outlets and Inlets 23 74 13 Roof Top Heat Pump Units DIVISION 25 INTEGRATED AUTOMATION Section 25 55 00 Instrumentation and Control For HVAC DIVISION 26 ELECTRICAL Section 26 05 00 Common Work Results for Electrical 26 05 05 Selective Demolition for Electrical 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 35 Surface Raceways for Electrical Systems 26 05 48 Vibration and Seismic Control for Electrical Systems 26 05 53 Identification for Electrical Systems 26 05 73 Overcurrent Protective Device Coordination Study 26 22 00 Low Voltage Transformers 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 16 Enclosed Switches and Circuit Breakers 26 50 00 Lighting DIVISION 31 EARTHWORK Section 31 00 00 Earthwork and Grading 31 23 00 Trenching, Backfilling and Compacting DIVISION 32 SITE WORK Section 32 10 00 Site Demolition 32 12 16 Asphalt Paving 32 12 33 Paving and Surfacing 32 13 16 Sitework Concrete 32 16 00 Portland Cement Concrete Paving 32 17 23 Pavement Marking 32 33 13 Bicycle Racks 32 33 23 Trash & Recycling Receptacles 32 84 00 Irrigation 32 91 13 Soil Preparation 32 93 00 Planting DIVISION 33 UTILITIES Section 33 10 00 Water Systems 33 30 00 Sanitary Sewer 33 40 00 Storm Drainage


PROJECT NAME:

Evans Center Modernization & Voluntary Seismic Upgrade - CCSF

BID CONTRACT #:

Bid No. IFB 2026-079

AWARDING AGENCY:

San Francisco Community College District

PROJECT LOCATION:

1400 Evans Ave., San Francisco, CA, 94124

BID DUE DATE:

04-13-2026 at 01:00 PM

OUTREACH COORDINATOR:

Project Manager

TELEPHONE:

(510)972-8750

FAX:

Not Available

ADDRESS:

6689 Skyline Blvd, Oakland, CA, 94611

PROJECT DETAILS:

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.
All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available through link below https://cgvlj04.na1.hs-sales-engage.com/Ctc/GD+23284/cGvlJ04/JlF2-6qcW8wLKSR6lZ3m8W6pdn9s618s3lN1Dshp_JSl-RVnJ9_B3s72t3W3sS5Cv1xPydmVN714z3gGF9ZW3blMkY6bFmLBW3jyvD91HR04KW3l6JS15_RxSSW6_qGdm5hSrThW6VNwPN2nW1ttW1DvXN62F_ZhqW3QPVKC1mHzzdW5G_NMm2h5KNRW8mwJ8c1d31SmW77YXS84dyRgmN4C0mz0D6bHxW3NMzvR3V2RvMW3Mx7rM1JLtkrW6yGXhG58Gl4kW68rhHR46R2rFN3NVDQSCWkNgW4_n8PH3DP5K6W8d8g6Z4c4tNHW97V2Cm18VLkfW30tGpt5sl8JRW47GhH53tLRXVW3C2X-x86hhTrW75ksnL1qFfGMf6qShyT04 link.

We will assist with Bonds, Lines of Credit and Insurance if needed. Plans & specs available to view in our office.

Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans available from owner or are available for review at our office in.

Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (If required).

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.