Trade Journal

Caliagua Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide demolition and removals; site prep/earthwork/grading; temporary facilities and bypass pumping to maintain operations; yard piping and tie-ins; concrete/flatwork; asphalt paving/striping; fencing and gates; landscaping/irrigation; structural modifications/seismic retrofits; mechanical/process equipment (pumps, mixers, screens/grit/dewatering/digestion equipment as applicable); electrical power distribution (switchgear/MCCs, conduits, feeders, grounding, lighting/HVAC power); instrumentation and controls (PLC/SCADA integration, wiring, programming); testing/inspection


PROJECT NAME:

Wastewater Treatment Plant Upgrades Project Phase 2

BID CONTRACT #:

Project No. 521006

AWARDING AGENCY:

City of Redlands

PROJECT LOCATION:

1950 Nevada Street, Redlands, CA, 92374

BID DUE DATE:

04-02-2026 at 01:00 PM

OUTREACH COORDINATOR:

Ryan Ricard

TELEPHONE:

8664164214

FAX:

Not Available

ADDRESS:

4930 E La Palma Ave, Anaheim, CA, 92807

PROJECT DETAILS:

An Equal Opportunity Employer & Complies with the Standard Federal Equal Employment Specifications

All Qualified AND/OR Certified DBE Subcontractors and Material/Equipment Suppliers are requested to forward quotes for the above-referenced project.

Project Documents: https://vendors.planetbids.com/portal/24639/bo/bo-detail/138044

Free access to the project documents can be furnished upon request. Caliagua Inc. is signatory to the Operating Engineers, Laborers, Cement Masons and Carpenters Unions. Subcontractors must possess a current contractor’s license, DIR Registration, insurance and workers compensation coverage per project requirements. Subcontractors and Suppliers are expected to bid per plans and specifications. Quotes need to be submitted at a reasonable time prior to the bid date. 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.