is seeking certified and qualified DVBE subcontractors and/or suppliers to provide SITE WORK:• NEW ACCESSIBLE RAMP TO CAMPUS FROM CITY SIDEWALK ON BROADWAY AVENUE. • REPLACE CHAIN LINK FENCING AT FRONT OF CAMPUS WITH NEW DECORATIVE FENCING. EXPAND FENCING FOR CAMPUS SECURITY.• NEW WALL MOUNTED ACCESSIBLE DRINKING FOUNTAIN AT GYMNASIUM BUILDING G.• EXPAND KINDER YARD AND FENCING. • UPGRADE EXISTING ACCESSIBLE PARKING STALLS FOR CODE COMPLIANCE. • CONNECT DOWNSPOUT TO EXISTING UNDERGROUND STORM DRAIN LINE AT BUILDING L. ITEMS EXEMPT FROM STRUCTURAL TESTING / SPECIAL INSPECTIONS PER DSA IR-A22 AND DSA-103: • SITE FLATWORK - CONCRETE BATCH PLANT INSPECTIONS - EPOXY SHEAR DOWELS - REINFORCING BARS • WELDING FOR FENCING AND GATES WITH A MAX 10' LEAF SPAN AND LESS THAN 8' HIGH ABOVE LOWEST ADJACENT GRADE BUILDINGS: • NEW VCT FLOORING AT CLASSROOMS D-4, D-8, AND K-12. • REPLACE EXTERIOR DOORS WITH NEW FRP DOORS UNLESS OTHERWISE NOTED. • UPGRADE STAFF UNISEX RESTROOM F-27 (AT MULTI-PURPOSE BUILDING F) FOR ACCESSIBILITY. • NEW FRONT OFFICE ENTRANCE, OPENING IN CMU SHEAR WALL OF ADMINISTRATION BUILDING E. • NEW DOOR SIGNAGE. • RELOCATE LIGHT SWITCH AT CLASSROOM DOORS WITH NEW SWING. • STANDARDIZE CLASSROOM POWER OUTLETS - 8 TOTAL POWER OUTLETS TO BE PROVIDED PER CLASSROOM. • NEW INTERIOR DOORS INTO CORRIDOR WOOD SHEAR WALLS FOR EGRESS, AND NEW OPERABLE WINDOWS AT CLASSROOMS B-9 AND B-11 AT BUILDING B. • NEW EXTERIOR DOORS FOR EGRESS, WITH ADJACENT OPERABLE WINDOWS AT CLASSROOMS B-4 AND B-6. • MINOR RESTROOM UPGRADES FOR ACCESS COMPLIANCE AT BUILDINGS F, G, L, M, & K. • NEW FLOORING IN BOYS AND GIRLS RESTROOMS AT BUILDING M. (AT BOYS RESTROOM M-1 IN BUILDING M): ANKLESS URINALS AND REPLACE WITH NEW • REMOVE ALL T FLUSHING URINALS. • REMOVE 1" WATERLINE BEHIND URINALS AND REPLACE WITH 1-1/2" LINE FOR NEW FLUSHING URINALS. REMOVE WALL FINISHES AND REPLACE TO MATCH EXISTING. • NEW URINAL PARTITIONS.
MARTIN LUTHER KING JR. SCHOOL OF THE ARTS MODERNIZATION PHASE 2
PROJECT #8365
Monterey Peninsula Unified School District
1713 Broadway Avenue, Seaside, CA, 93955
03-12-2026 at 02:00 PM
Connor Farotte
408-710-5576
408-847-4655
P.O. Box 1805 , Gilroy, CA, 95021
PROJECT DETAILS:
We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available through dropbox link(s) below:
PLANS
SPECS
ADDENDUM(S)/MISC
PLEASE SUBMIT BIDS BY 11:00 A.M. ON THURSDAY, MARCH 12, 2026 SO THAT WE CAN PREPARE COMPLETE PACKET AND SUBMIT A TIMELY BID.