Trade Journal

ProWest Constructors

is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide SURVEYING, FINAL CLEAN, SWPPP, DEMOLITION, CRACK INJECTION AND SPALL REPAIR, REINFORCING STEEL, CAST-IN-PLACE CONCRETE, HANDRAILS AND RAILINGS, DECORATIVE METAL, ROUGH CARPENTRY, CABINETS AND MILLWORK, WATERPROOFING, INSULATION, ROOFING, SHEETM METAL FLASHING AND TRIM, DOORS, FRAMES AND HARDWARE, DRYWALL AND METAL STUDS, LATH AND PLASTER, CERAMIC TILE, ACOUSTICAL CEILINGS, CARPET AND RESILIENT FLOORING, PAINTING, SIGNAGE, TOILET PARTITIONS AND BATHROOM ACCESSORIES, FIRE EXTINGUISHERS AND CABINETS, PARKING CONTROL EQUIPMENT, PROJECTION SCREENS, WINDOW COVERINGS, SITE FURNISHINGS, COMMUNICATIONS, INTERCOM SYSTEMS, AUDIO VISUAL, FIRE ALARM, INTRUSION DETECTION, EARTHWORK, AC PAVING, SITE CONCRETE, FENCES AND GATES, LANDSCAPING AND IRRIGATION, SITE UTILITIES


PROJECT NAME:

LAUSD Girls Academy Leadership Academy

BID CONTRACT #:

10373552

AWARDING AGENCY:

Los Angeles Unified School District

PROJECT LOCATION:

2328 St James Pl., Los Angeles, CA, 90007

BID DUE DATE:

03-11-2026 at 05:00 AM

OUTREACH COORDINATOR:

Alicia Daniel

TELEPHONE:

9516781038

FAX:

9516781083

ADDRESS:

22710 Palomar Street, Wildomar, CA, 92595

PROJECT DETAILS:

PROJECT DESCRIPTION:

This project includes site preparation, infrastructure, utility connections, and building integration to support the installation of portable classrooms and support buildings on an active LAUSD campus. LAUSD’s Relocation Housing Unit (RHU) will furnish, deliver, and set the portable classroom, restroom, and chemistry lab buildings, including raised wood foundations and associated building skirting. Contractor-performed scope includes preparation of building pads, utility extensions and tie-ins, fire sprinkler installation, fire alarm connections, accessibility improvements, exterior painting and branding, and all site restoration required to support the portable installations. The project also includes demolition and removal of three uncertified portable buildings.


 

In addition to portable building coordination, the scope includes extensive site and infrastructure work, including sanitary sewer, water, and electrical utility upgrades; accessible paths of travel; fencing and motorized gates; EV charging infrastructure; site lighting; landscape and hardscape restoration; construction of a new staff parking lot; and monument signage and outdoor learning areas. Interior alterations and ADA upgrades to existing campus restrooms and staff lounge areas are also included.


 

Estimated Cost: $11,713,000

Project Duration: 25 Months (760 Calendar Days)

Liquidated Damages: $1,500/Day

Prevailing wage rates apply to this project

Bids must remain valid for a minimum of 60 days

Disabled Veteran Business Enterprise (VBE) participation goal: 5%

Small Business Enterprise (SBE) participation goal: 25%

Compliance with Skilled and Trained Workforce requirements is mandatory

Project is governed by a Project Stabilization Agreement (PSA)