is seeking certified and qualified DBE and DVBE subcontractors and/or suppliers to provide Demolition, Carpentry, Paving trades
Visitacion Valley Elementary School - Play Yard Greening, Project No. 12511
12511
San Francisco Unified School District
55 Schwerin Street, San Francisco, CA, 94134
02-12-2026 at 11:00 AM
Kyle Zhou
(415) 465-0552
Not Available
1124 87th Street, Daly City, CA, 94015
PROJECT DETAILS:
The Project is generally described as: The Work includes but is not limited to: (a) removal of pavement and construction of two bioretention basins (b) construction of at-grade planters (c) removal of play yard striping (d) application of new play yard markings (e) relocation of two existing onsite basketball posts / backboards (f) installation of a new irrigation system (g) modifications to the
onsite drainage system (h) the removal, storage and reinstallation of site furnishings and
logs (provided by the District), and (i) the construction of the permeable base and
perimeter curb for a synthetic turf sports field (the synthetic turf, shock pad and plastic
nailer board will be supplied and installed by the District under a separate contract).
Refer to Appendix C for Interim Placement of Site Furnishings Diagram showing the
approximate locations of site furnishings and logs temporarily installed by the District
prior to the start of this Project. The Contractor must carefully move and store these
items during construction and then re-install them in the locations indicated on the
Contract Drawings.
Alternate No. 1: New Basketball Posts/ Boards: Differential Price
In lieu of removing, salvaging and re-installing two existing basketball posts / backboards
at the new basketball court location, the Contractor shall demolish and dispose of the
two existing basketball hoops and install two new basketball posts / backboards at the
new basketball court location.
Alternate No. 2: Four New at Grade Planters
Construct two new at-grade planters in the upper play yard against the eastern site
boundary and two new at-grade planters in the lower play yard near the entrance from
the parking lot. The total of all four planters is 1,205 sf. This alternate includes demolition
and disposal of existing asphalt pavement and base aggregate, grading, installation of
metal edging along the sawcut pavement edge, planting, and installation of irrigation
system in accordance with the Alternate Site Layout Plan included in the Contract
Drawings.
Allowance No. 1 for Potential Naturally Occurring Asbestos (NOA) Compliance: Include
the sum of Twenty-Five Thousand Dollars ($25,000) for additional compliance measures
in the event suspect serpentine rock or NOA is observed during excavation/trenching.
Work under this allowance shall include, but not be limited to, observation and site
controls, confirmatory sampling/analysis, enhanced dust suppression, air monitoring for
personnel exposure assessments, and associated documentation/notification. Work
shall be authorized only by written directive from the Owner/Owner's Representative.
Unused allowance funds shall be credited to the Owner via Change Order
The estimated construction value of the work is $580,000.00.
We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin.