Trade Journal

WYSONG CONSTRUCTION

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Work includes: Site clearing, minor demolition for remodel, concrete reinforcement, cast-in-place concrete, structural steel, metal fabrications, carpentry, interior architectural laminated casework, building insulation, weather barriers, underslab vapor barrier, metal roof panels, sheet metal flashing and trim, flexible sheet flashing, roof accessories, joint sealants, steel doors and frames, access doors, overhead coiling doors, aluminum entrances and storefronts, door hardware, glazing, Portland cement plaster, gypsum board, ceramic tile, acoustical panel ceilings, resilient base and accessories, carpet, painting, signage, fire protection specialties, plumbing, HVAC, electrical, low voltage electrical power conductors and cables, grounding and bonding, raceways and boxes, wiring devices, interior lighting, earth moving (w Soils Report) and concrete paving.


PROJECT NAME:

AHS ENTRY SECURITY IMPROVEMENTS LLB

BID CONTRACT #:

WCC-2026-02

AWARDING AGENCY:

ATASCADERO UNIFIED SCHOOL DISTRICT

PROJECT LOCATION:

1 HIGH SCHOOL HILL ROAD, ATASCADERO, CA, 93422

BID DUE DATE:

02-05-2026 at 11:00 AM

OUTREACH COORDINATOR:

WILL FERRARO CHELSEA JORDAN

TELEPHONE:

18054661038

FAX:

8054665176

ADDRESS:

7025 MORRO ROAD, ATASCADERO, CA, 93422

PROJECT DETAILS:

WYSONG CONSTRUCTION IS BIDDING AS GENERAL CONTRACTOR PER THIS NOTICE OF REQUEST FOR PROPOSALS AND QUALIFICATIONS FOR LEASE-LEASEBACK CONTRACT AND SERVICE.

Plans, specs and Addenda 01 & 02 can be downloaded at the following link:

https://www.dropbox.com/scl/fo/1pvyqqfhjclbv3i4rj6ad/AHNAqX6rAunQp4YVAYm-uj8?rlkey=7odah4jeaf3mp9o5rngx5ktwz&st=61jffq5a&dl=0

Please confirm your proposal contains Addendum 01 & 02.

If you have any questions, please let us know.  We appreciate your participation.

SKILLED AND TRAINED WORKFORCE:  
Contractor and all Subcontractors of any tier must comply with the requirements set forth in Education Code section 17407.5, including providing an enforceable commitment that the Contractor and all Subcontractors of any tier will use a “Skilled and Trained Workforce” as defined in Education Code section 17407.5 (b)(3). Contractor and all Subcontractors are to carefully review all requirements set forth in Education Code section 17407.5 before entering into the Contract for the Project. Subcontractor shall submit Skilled and Trained Workforce Compliance Report with Progress Billings each month. Billings will not be accepted without Reporting. Skilled and Trained Workforce Requirements are for Prime Subcontractors only (1/2 of 1% of Total Contract).

Wysong Construction Co., an equal opportunity employer is bidding the following project and is seeking bids from Disabled Veteran Business Enterprise (DVBE) subcontractors, suppliers and shippers. Payment and performance bonds may be required, assistance is available. Please send the appropriate certification with your bid.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.