is seeking certified and qualified DVBE subcontractors and/or suppliers to provide selective non-structural demolition, selective demolition site work, concrete forming and accessories, concrete reinforcing, cast-in-place concrete, permanent grandstands, HVAC, HVAC controls, central HVAC equipment, electrical general provisions, basic materials and methods, conductors, grounding systems, hangers and supports for electrical systems, raceways, panelboards, wiring devices, interior lighting, exterior lighting, nondestructive utility location, site clearing, earth moving, excavation support and protection, concrete paving, chainlink fence and gates, storm utility drainage piping, underground conduit systems and other work required to complete the project.
New Stadium Bleachers & Press Box and New Lunch Shelter Additions Project at Durham High School
Not Available
Durham Unified School District
9455 Putney Drive, Durham, CA, 95938
01-27-2026 at 02:00 PM
Edgar Ibarra
530-624-7466
(530)345-8885
PO Box 6039, Chico, CA, 95927
PROJECT DETAILS:
We at United Building Contractors, Inc. are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available through Box link below.
https://ubcinc.box.com/s/16viw20l0pd2or7x9p5waeotken63pkh
Please contact Nick Gudgel (nickg@unitedbuildingcontractors.com) if you plan to bid this project, or if you have any questions you can fax, email or contact him by phone.
Sincerely,
United Building Contractors, Inc
P O Box 6039, Chico, CA 95927
530.345.8455 (v) 530.345.8885 (f)