Trade Journal

Knife River Construction

is seeking certified and qualified HUD Section 3 subcontractors and/or suppliers to provide MOBILIZATION, LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), ADVANCED NOTIFICATION, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE AND IMPLEMENT STORM WATER POLLUTION PREVENTION PLAN, STREET SWEEPING, POTHOLE DATA, CLEARING AND GRUBBING, CONSTRUCTION SURVEYS, ROADWAY EXCAVATION, ROADWAY EXCAVATION (PULVERIZED MATERIAL) (F), SHOULDER BACKING, CLASS 2 AGGREGATE BASE, PULVERIZED ROADBED, ASPHALTIC EMULSION (PULVERIZED ROADBED), FULL-DEPTH RECYCLING-CEMENT, CEMENT (FULL-DEPTH RECYCLING-CEMENT), ASPHALTIC EMULSION (FULL-DEPTH RECYCLING-CEMENT), MIX DESIGN (FULL-DEPTH RECYCLING-CEMENT), SLURRY SEAL (TYPE II), HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT (MISC AREA), DRIVEWAY PREPERATION, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, REMOVE PIPE, 36" CMP, 48" CMP, RSP (60 LB, CLASS II, METHOD B), RSP FABRIC (CLASS 8), MINOR CONCRETE (CURB TYPE A1-6), MINOR CONCRETE (CURB AND GUTTER) A2-6, MINOR CONCRETE (SIDEWALK), MINOR CONCRETE (CURB RAMP), MINOR CONCRETE (DRIVEWAY), REMOVE CONCRETE, DETECTABLE WARNING SURFACE, ADJUST STREET MONUMENT COVER TO GRADE, REMOVE AND REPLACE STREET MONUMENT, REMOVE AND REPLACE SURVEY POINT, ADJUST ACCESS BOX FRAME AND COVER (WATER), ADJUST MANHOLE FRAME AND COVER (STORM DRAIN), LOWER AND RAISE FRAME AND COVER (WATER), LOWER AND RAISE FRAME AND COVER (HYDRANT), REMOVE ROADSIDE SIGN, THERMOPLASTIC PAVEMENT MARKING, 6" TERMOPLASTIC TRAFFIC STRIPE, PAVEMENT MARKERS (BLUE RETROREFLECTIVE-RECESSED)


PROJECT NAME:

Off-System Roadway Rehabilitation - 2026

BID CONTRACT #:

8407.4 CON

AWARDING AGENCY:

Town of Paradise

PROJECT LOCATION:

Multiple Streets, Paradise, CA, 95969

BID DUE DATE:

01-26-2026 at 02:00 PM

OUTREACH COORDINATOR:

Marc Madesn

TELEPHONE:

5308916555

FAX:

5308946220

ADDRESS:

1764 Skyway, Chico, CA, 95928

PROJECT DETAILS:

Baldwin Contracting Company, Inc. dba Knife River Construction is bound by the Master Labor Agreement with the Laborers, Operating Engineers and Teamsters. If your company enters into a subcontract with Baldwin, portions of those Labor Agreements may be applicable to your scope of work.

 

Assistance is available to HUD’s for obtaining bonding, lines of credit or insurance and any technical assistance related to the Plans and Specifications. In addition, assistance is available to obtain necessary equipment, supplies, materials or services. For your convenience, a set of Plans is available for review at our office.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.