is seeking certified and qualified HUD Section 3 subcontractors and/or suppliers to provide MOBILIZATION, LEAD COMPLIANCE PLAN, BASELINE SCHEDULE (CRITICAL PATH METHOD), ADVANCED NOTIFICATION, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE AND IMPLEMENT STORM WATER POLLUTION PREVENTION PLAN, STREET SWEEPING, POTHOLE DATA, CLEARING AND GRUBBING, CONSTRUCTION SURVEYS, ROADWAY EXCAVATION, ROADWAY EXCAVATION (PULVERIZED MATERIAL) (F), SHOULDER BACKING, CLASS 2 AGGREGATE BASE, PULVERIZED ROADBED, ASPHALTIC EMULSION (PULVERIZED ROADBED), FULL-DEPTH RECLAMATION-CEMENT, CEMENT (FULL-DEPTH RECLAMATION-CEMENT), ASPHALTIC EMULSION (FULL-DEPTH RECLAMATION-CEMENT), MIX DESIGN (FULL-DEPTH RECLAMATION-CEMENT), HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT (MISC AREA), COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, ADJUST INLET, MINOR CONCRETE (CURB TYPE A1-6), MINOR CONCRETE (CURB AND GUTTER A2-6), MINOR CONCRETE (SIDEWALK), MINOR CONCRETE (CURB RAMP), MINOR CONCRETE (DRIVEWAY), REMOVE CONCRETE, DETECTABLE WARNING SURFACE, ADJUST MONUMENT COVER TO GRADE, REMOVE AND REPLACE NONTRAFFIC PULL BOX NO. 5, ADJUST ACCESS BOX FRAME AND COVER (UTILITY), ADJUST MANHOLE FRAME AND COVER (UTILITY), ADJUST MANHOLE FRAME AND COVER (STORM DRAIN), REMOVE AND REPLACE SURVEY POINT, REMOVE AND REPLACE STREET MONUMENT, LOWER AND RAISE FRAME AND COVER (UTILITY), LOWER AND RAISE FRAME AND COVER (HYDRANT), RELOCATE MAILBOX, REMOVE ROADSIDE SIGN, RELOCATE ROADSIDE SIGN, ROADSIDE SIGN - ONE POST, THERMOPLASTIC PAVEMENT MARKING, 6" TERMOPLASTIC TRAFFIC STRIPE, 8" TERMOPLASTIC TRAFFIC STRIPE, PAVEMENT MARKERS (RETROREFLECTIVE-RECESSED), PAVEMENT MARKERS (BLUE RETROREFLECTIVE-RECESSED), TEMPORARY SIGNAL DETECTION, MODIFY SIGNAL AND LIGHTING @ SKYWAY/ELLIOTT, MODIFY SIGNAL AND LIGHTING @ SKYWAY/MAXWELL, MODIFY SIGNAL AND LIGHTING @ SKYWAY/WAGSTAFF, MODIFY SIGNAL AND LIGHTING @ SKYWAY/CLARK, 6” RUMBLE TRIP (ASPHALT CONCRETE PAVEMENT), RECTANGULAR RAPID FLASHING BEACON
On-System Roadway Rehabilitation - Misc 2026
7303.6 CON
Town of Paradise
Multiple Streets, Paradise, CA, 95969
01-21-2026 at 02:00 PM
Levi Hubbard
5308916555
5308946220
1764 Skyway, Chico, CA, 95928
PROJECT DETAILS:
Baldwin Contracting Company, Inc. dba Knife River Construction is bound by the Master Labor Agreement with the Laborers, Operating Engineers and Teamsters. If your company enters into a subcontract with Baldwin, portions of those Labor Agreements may be applicable to your scope of work.
Assistance is available to HUD’s for obtaining bonding, lines of credit or insurance and any technical assistance related to the Plans and Specifications. In addition, assistance is available to obtain necessary equipment, supplies, materials or services. For your convenience, a set of Plans is available for review at our office.