is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide Dispute Resolution Advisor, Water Pollution Control, Erosion Control, SWPPP, Traffic Control, Portable Changeable Message Signs, Construction Area Signs, Flagging, Sweeping, Cold Plane Pavement, Rumble Strip, AC Paving, Tack Coat, Adjust Castings, Hot Mix Asphalt, Rubberized Hot Mix Asphalt, Slurry Seal, Aggregate Base, Oil, RCP, Striping, Pavement Markers, Lead Compliance Plan, Data Cores, Traffic Signals & Lighting
CONSTRUCTION ON STATE HIGHWAY IN SAN JOAQUIN COUNTY NEAR STOCKTON FROM 0.3 MILE WEST OF ORO AVENUE TO 0.9 MILE WEST OF MURRAY ROAD AND AT LINDEN FROM 0.1 MILE EAST OF DUNCAN ROAD TO 0.2 MILE EAST OF MARKET STREET
10-1U0404
Caltrans
State Highway 26, Linden, CA, 95236
01-29-2026 at 02:00 PM
Ashley Cruz
209-932-2100
209-948-6652
655 W. Clay Street, Stockton, CA, 95206
PROJECT DETAILS:
Contact Knife River Construction for assistance in obtaining bonds, insurance, lines of credit, equipment, supplies, materials or project plans and specifications.
Knife River Construction is willing to break out any portion of work to encourage DVBE and SBE participation.
The DVBE Contract goal is 3 percent for this project.
The SBE Contract goal is 5 percent for this project.
We are an Equal Opportunity Employer.
Please contact Knife River Construction by 1/28/2026 with quotes