Trade Journal

W. M. Lyles Co.

is seeking certified and qualified DBE, MBE, SBE, WBE and WOSB subcontractors and/or suppliers to provide Electrical, HVAC, Paving, Painting and Coating, Fencing and Gates, Rebar, Earthwork, Structural Steel Framing, Access Doors, Ready-mix Concrete, Precast Concrete Structures, Aggregates, Pipe and Valve Materials, Dampproofing, Roof Hatches, Metal Fabrications


PROJECT NAME:

Santa Barbara Cater Reservoir Resiliency Project

BID CONTRACT #:

5106

AWARDING AGENCY:

City of Santa Barbara

PROJECT LOCATION:

1150 San Roque Road, Santa Barbara, CA, 93105

BID DUE DATE:

01-22-2026 at 03:00 PM

OUTREACH COORDINATOR:

Marc Vanden

TELEPHONE:

916-375-1833

FAX:

Not Available

ADDRESS:

P.O. Box 28130, Fresno, CA, 93729

PROJECT DETAILS:

This project consists of a new Chlorine Contact Basin, and structural upgrades of the existing Finished Water Reservoir. Construction requires the removal of Solids Recovery Basin (SRB) #3 and relocation of piping and electrical for the Solids Recovery Pump Station. The remaining work consists of a new ramp into the Concrete-Lined Basin, a roadway along the west and south side of the SRBs, replacement of HVAC equipment, and new generators at the Operations Annex and South Coast Booster Pump Station. Work also includes installation of piping and other appurtenances to complete the work, and the repair and reconstruction of existing improvements affected by the Work, and incidentals for complete and usable facility.

WML actively invites and encourages all certified DBE Firms during our bidding processes. We are an equal opportunity employer. The plans and specs are available for your review at our office. We accept bids on any and all portions of work. We will receive pricing for a breakdown of items. For example, a painting scope could be broken out into above-grade piping, below-grade piping, building coatings, equipment coatings, CMU wall protective coating, chemical floor coating, etc. We can make efforts to establish delivery schedules, where requirement permits, to encourage your participation. We actively invite and encourage all certified DBE Firms during our bidding processes.  If the project has a specified GFE, WML also requires subcontractors to follow the same required steps. We encourage DBE companies to contract with a consortium of DBEs when a contract is too large for your firm to handle individually. We will work with certified DBE’s that group together if the scope of work is too large for one firm. W. M. Lyles Co. and all subcontractor/suppliers shall abide by the requirements of 41 CFR §§ 60-1.4(a), 60-300.5(a) and 60-741.5(a). These regulations prohibit discrimination against qualified individuals based on their status as protected veterans or individuals with disabilities and prohibit discrimination against all individuals based on their race, color, religion, sex, sexual orientation, gender identity, national origin, or for inquiring about, discussing, or disclosing information about compensation. Moreover, these regulations require that covered prime contractors and subcontractors take affirmative action to employ and advance in employment individuals without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, protected veteran status or disability.  By submitting a proposal you agree to comply with all the provisions set forth in 29 CFR Part 471, Appendix A to Subpart A (Executive Order 13496).

Project Clarifications:
The plans and specifications available for review are “As Advertised” and “For Information Only”. We highly encourage all subcontractors and suppliers to request and procure with the owner their own project documents in order to receive any and all updates via addendum. 

Contractor License Number, DIR Registration Number and DBE Certification must be included with any bid submission. 
Please note that all California public works projects are prevailing wage projects and that WML is signatory to the Carpenters, Cement Masons, Laborers, and Operator Engineers Unions.


Please note that you may be required to furnish a 100% Payment & Performance Bond from an approved surety based on the amount of the bid. The Bond costs, based on your provided bid day rate, will be paid by W. M. Lyles Co. Please include your bond rate with your proposal. 


This project DOES require “Build America, Buy America” (BABA). 

Thank you in advance for your assistance with this project.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.