is seeking certified and qualified DBE, DVBE, MBE, SBE, SDVOSB and WBE subcontractors and/or suppliers to provide Survey, SWPPP and Erosion Control, Final Clean, Demolition and Abatement, Structural Concrete, Masonry, Rebar, Structural Steel, Misc. Metals, Metal Decking, Rough Carpentry, Finish Carpentry, Waterproofing, Insulation, Roofing, Sheet Metal, Metal Panels, Skylights, Doors, Frames and Hardware, Storefront, Curtain Walls and Glazing, Metal Framing, Drywall, Exterior Finishes, Tiling, Acoustical Ceilings and Acoustical Wall Panels, Flooring, Painting and High Performance Coatings, Construction Specialties, Signage, Play Area Specialties, Elevators, Fire Suppression, Plumbing, HVAC, Electrical, Low Voltage, Earthwork and Site Demolition, Asphal Paving, Pavement Markings, Site Concrete, Playground Specialties, Landscape and Irrigation, Site Utilities, Chain Link and Decorative Metal Fencing/Gates, and Photovoltaic
SDUSD Bird Rock Elementary School Whole Site Modernization GMP No. 1 (Lease-Leaseback)
LB25-0201-50-A2-G1
San Diego Unfied School District
5371 La Jolla Hermosa Avenue, La Jolla, CA, 92037
01-20-2026 at 11:00 AM
Christina Williams
6263518800
Not Available
7588 Metropolitan Drive , San Diego, CA, 92108
PROJECT DETAILS:
C. W. Driver, LLC
Requesting Bid Submissions From:
DVBE, MBE, SBE, WBE & SDVOB Subcontractors, Suppliers, and Vendors
Project: SDUSD Bird Rock Elementary School Whole Site Modernization
LB25-0201-50-A2-G1 - GMP No. 1 (Lease-Leaseback)
Bid Date: January 20, 2026, by 11:00 a.m.
Project Description:
Demolish 11 modulars and two buildings. Construction of (1) admin building 100, (1) UTK/Kinder classroom building 200, and (1) 2-story classroom building 500. Alterations to Classroom building 300 (formerly bldg. 100), and multi-purpose building 600 (formerly bldg. 300). New finishes, fire alarm, technology, and electrical. Limited alteration to library building 400 (formerly bldg. 500) with new fire alarm, signage and exterior paint. New hardscape, asphalt paving, planting and irrigation. New playground shade structure and PV canopy. Project is located at Bird Rock Elementary School - 5371 La Jolla Hermosa Avenue, La Jolla, CA 92037.
For access to the documents, please contact Christina Williams at cwilliams@cwdriver.com
Contracting Agency: San Diego Unified School District
Successful bidders will be required to enter into a PSA agreement.
In addition, bidders are required to have both SDUSD and General Contractor prequalification