is seeking certified and qualified DBE subcontractors and/or suppliers to provide AC DIKE (TYPES A, C, D, E & F), ANTI-GRAFFITI COATINGS, ASBESTOS COMPLIANCE PLAN, ASBESTOS SURVEY & SAMPLING, BIOLOGIST, CIDH PILING, CLASS 2 BASE, CLEARING & GRUBBING, COLD PLANE, CONCRETE BARRIER (TEMP. & PERMANENT), CONCRETE GRINDING, CONSTRUCTION AREA SIGNS, DOWELS & BASKETS, ELECTRICAL, ENCAMPMENT REMOVAL & CLEANUP (APPROVED HAZ. MATERIAL REMEDIATION), ERECT STRUCTURAL STEEL-BRIDGE, EROSION CONTROL (TEMPORARY), EXCAVATION, FENCING-CHAIN LINK FENCE, FURNISH STRUCTURAL STEEL-BRIDGE, GRADING, GUARDRAIL, HIGH VISIABILITY FENCE, HYDROMULCHING, HYDROSEEDING, JOINT SEAL, JPCP, K-RAIL (TEMPORARY), LANDSCAPE & IRRIGATION, LEAN CONCRETE BASE, LOOP DETECTORS, MASONARY BLOCK SOUNDWALL, MATERIALS, MINOR CONCRETE, MISC. IRON & STEEL, MISC. METALS, NOISE MONITORING, OVERHEAD SIGN STRUCTURES, POLYESTER OVERLAY, PREPARE & STAIN CONCRETE, QC/QA, RCP-(18”, 24”, 30”, 36”, 42”, 48”), REBAR, REMOVALS-MISCELLANEOUS, RENTAL EQUIPMENT, ROADSIDE SIGNS, ROCK SLOPE PROTECTION, SHORING, SLOPE PAVING, STORM DRAIN STRUCTURES, STRIPING & MARKING, SURVEY, SWPPP, TRAFFIC CONTROL, TREATED WOOD WASTE, TRUCKING
CONSTRUCTION OF THE INTERSTATE 10 CORRIDOR FREIGHT AND EXPRESS LANE PROJECT - CONTRACT 2A
IFB NO. 20-1003269, CONTRACT NO. 08-1P710, PROJECT ID 0824000082, FEDERAL PROJECT NO. 6507(055)
SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY (SBCTA)
I-10 FROM SAN ANTONIO AVE TO 0.3 MILES EAST OF SIERRA AVE., Ontario, CA, 91762
11-18-2025 at 02:00 PM
Jessica Daniels
17145789600
714-578-9672
135 S STATE COLLEGE BLVD STE 400, Brea, CA, 92821
PROJECT DETAILS:
An Equal Opportunity Employer
License No. 747612-A
DIR Registration No. 1000003664
135 S. State College Blvd., Suite 400, Brea, CA 92821
Phone: (714) 578-9600 FAX: (714) 578-9672
Contact: Estimating Department at bids@sully-miller.com
Plans, Specifications and Project Requirements are available for viewing on the Sully-Miller Website:
www.sully-millerplans.com, or Firms may request Plans & Specifications by e-mailing the SSI Document Release Form to jholliday@gosbcta.com (please allow three (3) business days for a response) before October 14, 2025.
Sully-Miller is willing to set aside any portion of work, no matter how small it is to encourage
(DBE PARTICIPATION) participation. If you require information regarding assistance in obtaining Bonding, Insurance, Credit, Equipment, Supplies, Materials, or Related Services, please call our office.
Sully-Miller Contracting Company is requesting all qualified Subcontractors/Vendors to please send in a Scope Letter for bid items being quoted, 48-72 hours prior to Bid Date & Time so any questions can be addressed by the Estimator.
100% Payment and Performance Bonds May Be Required
PDF ATTACHMENTS: