Trade Journal

Mike Bubalo Construction Co., Inc.

is seeking certified and qualified DBE, DVBE, LGBTBE, Los Angeles County CBE, Los Angeles County LSBE, MBE, SBE and WBE subcontractors and/or suppliers to provide BUT NOT LIMITED TO: Microtunneling, AC Paving, Pervious Concrete, Reinforcing Steel, Drilling of Soldier Piles, Shoring, Trucking, Electrical, Street Lighting, Communications, Landscape & Irrigation, Reinforced Concrete Pipe, Ductile Iron Pipe, Striping/Signage/Interpretive Signs, Traffic Control, Vibration/Noise Monitoring, Settlement Monitoring, Groundwater Monitoring Wells, Fence/Railing, Slide Gates, Radar Sensors, Aggregates and Construction Materials, LA County CBE Jobs Coordinator.


PROJECT NAME:

28TH STREET STORMWATER INFILTRATION PROJECT

BID CONTRACT #:

E1305-25C

AWARDING AGENCY:

CITY OF MANHATTAN BEACH

PROJECT LOCATION:

Manhattan Avenue from 28th Street to 26th Street, MANHATTAN BEACH, CA, 90266

BID DUE DATE:

10-01-2025 at 10:00 AM

OUTREACH COORDINATOR:

Anton Brkic

TELEPHONE:

6269607787

FAX:

6269607897

ADDRESS:

5102 GAYHURST AVE, BALDWIN PARK, CA, 91706

PROJECT DETAILS:

This Project consists of, but is not limited, to the following: demolition and removal of various existing PCC and asphalt improvements, tree removals, retaining wall, handrails, parking meters and poles, gate, traffic spikes, catch basins, light and post, SCE electrical vent, various traffic signs and irrigation improvements. Construction will consist of PCC and AC paving improvements, PCC sidewalks, curb and gutter, landscaping and irrigation improvements, excavation/installation of sedimentation system with filter system, trash collection, manholes, storm drain pipes, and retaining walls, diversion pump system, drywells, manholes, electrical components, Motor Control Center (MCC), variable frequency drives (VFD), PLC and SCADA cabinet, Electric Vehicle (EV) chargers, parking lights and poles, parking kiosks, barrier gates, various electrical connections for pumps, actuator valves, radar sensors, float switches, pressure switches, and instrumentation.

Please provide your proposal at least 24 hours prior to the bid due date and time. All subcontracts will be subject to the terms and conditions of the project specifications. Mike Bubalo Construction is signatory to Union agreements. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements. This project is subject to the hiring requirements of the Los Angeles Countywide Community Workforce Agreement (CWA) which includes a goal of 30% Qualified Local Resident Participation and 10% Targeted Worker Hire. Mike Bubalo Const., requires that any potential subcontractor be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Mike Bubalo Const., will reimburse Subcontractors for the required bond premium, so please provide your bond rate at time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of Mike Bubalo Construction, unless the specific project contract documents have other requirements. All subcontractors must be registered with the California Department of Industrial Relations as required by Public Contract Code Section 1725.5 in order to be considered for this bid and must submit with the bid, a signed certification verifying that the Subcontractor is registered with the DIR. This project is subject to State and Federal Funding regulations and requirements. and any addenda modifying the project plans are available on the City of Manhattan Beach web portal, https://www.manhattanbeach.gov/departments/pub;ic-works/bid-opportunites are available for viewing, by appointment, at our office.

If you are planning to bid this project, we encourage your participation and welcome your bid. Interested subcontractors can be accommodated to identify opportunities to break down items into economically feasible packages. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Subcontractors are encouraged to contact our office for insurance requirements, plan information, or if any other assistance is needed. Payment & Performance Bonds may be required & bonding assistance is available. The Contractor Development and Bonding Program (CDABP) is administered by the Chief Executive Office of the County of Los Angeles for all County Construction Contracting Departments. The CDABP provides a broad range of contractor technical assistance, training, and support in qualifying for bonds, as well as contract financing for County awarded contracts. The CDABP assistance is available to subcontractors. The CDABP is a County funded resource designed to reduce the barriers to small and diverse firms seeking to bid and contract on County projects. We are an Equal Opportunity Employer. Mike Bubalo Construction Co., Inc., (CSLB#771279) intends to seriously negotiate with qualified CBE firms for project participation. Assistance will be provided in obtaining bonds, lines of credit and/or insurance. Subcontractor and Supplier price quotes should be provided within a reasonable time frame prior to the bid deadline to enable a complete evaluation.  Please submit project mandated bid information to our office as soon as possible and at least 48 hours prior to the bid submission deadline.

This project has substantial Insurance Liability obligations and limits, please review the scope of Insurance and Indemnification required for all subcontractors in accordance with Section 5-4.1.10.

The Contract is subject to the requirements of the Contractor Employee Jury Service Ordinance (“Jury Service Program”) (Los Angeles County Code, Chapter 2.203). The Jury Service Program applies to subcontractors.

The Contract is subject to the requirements of the Los Angeles County Flood Control District’s Safe, Clean Water Program, Proposition 1 – the Water Quality, Supply, and Infrastructure Improvement Act of 2014 through an agreement with the State Water Resources Control Board, Proposition 68 under the Urban Flood Protection Grant Program administered by the California Natural Resources Agency, and the City of Manhattan Beach.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.