is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DISPUTE RESOLUTION ADVISOR ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, TYPE III BARRICADE, TEMP PAVEMENT MARKING, TEMP TRAFFIC STRIPE, CHANNELIZER, PORTABLE FLASHING BEACONS, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, TEMP BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN, STORM WATER (SAMPLING, ANALYSIS, REPORTING), TEMP HYDRAULIC MULCH, TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP SILT FENCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, WATER QUALITY (SAMPLING, ANALYSIS, MONITORING & REPORTING), TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, INVASIVE SPECIES CONTROL, CONTRACTOR SUPPLIED ARBORIST, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, ROADWAY EXCAVATION, SHOULDER BACKING, DITCH EXCAVATION, SOIL AMENDMENT, PLANT (GROUP M), PLANT ESTABLISHMENT WORK, WOOD MULCH, MOVE-IN/MOVE-OUT (EROSION CONTROL), IMPORTED TOPSOIL, HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT, COMPOST, INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE, HIGH FRICTION SURFACE TREATMENT, CRACK TREATMENT, HOT MIX ASPHALT, ASPHALT BINDER, GEOSYNTHETIC PAVEMENT INTERLAYER, PLACE HOT MIX ASPHALT DIKE, TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, STRUCTURAL CONCRETE, DRAINAGE INLET, CORRUGATED STEEL PIPE DOWNDRAIN, ANCHOR ASSEMBLY, CORRUGATED STEEL PIPE TEE ENERGY DISSIPATOR, ABANDON CULVERT, REMOVE REINFORCED CONCRETE BOX CULVERT, REMOVE INLET, SAND BACKFILL, GRAVEL FILTER, ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION FABRIC, MISC IRON & STEEL, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER, MARKER, TREATMENT BEST MANAGEMENT PRACTICE MARKER, REMOVE MARKER, REMOVE ROADSIDE SIGNS, FURNISH SINGLE SHEET ALUMINUM SIGNS, ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL, VEGETATION CONTROL MAT, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL, REMOVE GUARDRAIL, THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, RUMBLE STRIP, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, RADAR SPEED FEEDBACK SIGN SYSTEMS, TEMP SIGNAL SYSTEMS, MODIFYING FLASHING BEACON SYSTEMS
Earthwork, HMA-A, Drainage, High Friction Surface Treatment
01-0K1504
Caltrans
Route 101 near South Prairie Creek Park, Orick, CA, 95555
08-27-2025 at 02:00 PM
Cassie Coppini
(707) 443-6371
(707) 443-0277
200 Dinsmore Drive, Fortuna, CA, 95540
PROJECT DETAILS:
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. If your company is subject to the Air Resources Board Off-Road Diesel Vehicle Regulation please include your Certificate of Compliance with your quote. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.