Trade Journal

Knife River Construction

is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD (LS), DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION- BOARD-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), AUTOMATED FLAGGER ASSISTANCE DEVICE DAY, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY SILT FENCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (LS), TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, SHOULDER BACKING, DITCH EXCAVATION, ROADSIDE CLEARING, WOOD MULCH, MOVE-IN/MOVE-OUT (EROSION CONTROL), BONDED FIBER MATRIX (SQFT), ROLLED EROSION CONTROL PRODUCT (NETTING), FIBER ROLLS, COMPOST (CY), FINISHING ROADWAY, CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), DATA CORE, PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, (F) - STRUCTURAL CONCRETE, DRAINAGE INLET, (F) - MINOR CONCRETE (MINOR STRUCTURE), (F) - CONCRETE BACKFILL (PIPE TRENCH), 18" REINFORCED CONCRETE PIPE, FLUME DOWNDRAIN, 18" TAPERED INLET, FLUME ANCHOR ASSEMBLY, 18" STEEL FLARED END SECTION, 18" CONCRETE FLARED END SECTION, REMOVE DOWNDRAIN (EA), REMOVE ASPHALT CONCRETE OVERSIDE DRAIN, CLEANING, INSPECTING, AND PREPARING CULVERT (LF), 12" CURED-IN-PLACE PIPELINER, 18" CURED-IN-PLACE PIPELINER, 36" CURED-IN-PLACE PIPELINER, 42" CURED-IN-PLACE PIPELINER, ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), (F) - MISCELLANEOUS IRON AND STEEL, REMOVE DELINEATOR, DELINEATOR (CLASS 2), PAVEMENT MARKER (RETROREFLECTIVE- RECESSED), MILEPOST MARKER, MARKER (CULVERT), SNOW POLE MARKER, REMOVE MARKER, REMOVE ROADSIDE SIGN, REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD), REMOVE ROADSIDE SIGN PANEL, RESET ROADSIDE SIGN, RELOCATE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), MIDWEST GUARDRAIL SYSTEM (8' STEEL POST), TRANSITION RAILING (TYPE AGT), END CAP (TYPE A), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE IN-LINE TERMINAL TL-3, BURIED POST END ANCHOR (TYPE B-F), REMOVE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), 6" METHYL METHACRYLATE PAINT TRAFFIC STRIPE, METHYL METHACRYLATE PAINT PAVEMENT MARKING, 6" METHYL METHACRYLATE PAINT TRAFFIC STRIPE (RECESSED), 6" METHYL METHACRYLATE PAINT TRAFFIC STRIPE (RECESSED, BROKEN 12-3), 6" METHYL METHACRYLATE PAINT TRAFFIC STRIPE (RECESSED, BROKEN 36-12), 8" METHYL METHACRYLATE PAINT TRAFFIC STRIPE (RECESSED), 12" METHYL METHACRYLATE PAINT TRAFFIC STRIPE (RECESSED), TRAFFIC MONITORING STATION SYSTEM, FLASHING BEACON SYSTEM, MODIFYING TRAFFIC MONITORING STATIONS, MOBILIZATION


PROJECT NAME:

03-0J5204 - HWY 20 Above Nevada City HMA & Drainage

BID CONTRACT #:

03-0J5204

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Various Locations on HWY 20 from Dow Road to Yuba Pass Separation and Overhead, Nevada City, CA, 95959

BID DUE DATE:

09-09-2025 at 02:00 PM

OUTREACH COORDINATOR:

Marc Madsen

TELEPHONE:

5308916555

FAX:

5308946220

ADDRESS:

1764 Skyway, Chico, CA, 95928

PROJECT DETAILS:

Baldwin Contracting Company, Inc. dba Knife River Construction is bound by the Master Labor Agreement with the Laborers, Operating Engineers and Teamsters. If your company enters into a subcontract with Baldwin, portions of those Labor Agreements may be applicable to your scope of work.

 

Assistance is available to DBE’s for obtaining bonding, lines of credit or insurance and any technical assistance related to the Plans and Specifications. In addition, assistance is available to obtain necessary equipment, supplies, materials or services. For your convenience, a set of Plans is available for review at our office.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.