Trade Journal

Reyes Construction Inc

is seeking certified and qualified HUD Section 3, SBE, SDVOSB, VOSB, WBE and WOSB subcontractors and/or suppliers to provide Subcontractors- Painting and Coating, Geotechnical Engineer, Quality Control, Surveying, Applied Polyurethane Foam, Sawcutting, Hydroseed, Railing, Utility Locating, CCTV Inspection Supplier- Misc. Metals, Geotextile, Erosion Control, Trench Drain, Aggregates and Asphalt, Ready-Mix Concrete, Rip Rap, Solar Powered Lighting Fixtures


PROJECT NAME:

B-380 Concrete Stairs and Slope Erosion Repair

BID CONTRACT #:

N62473-25-R-M514

AWARDING AGENCY:

NAVFAC Southwest

PROJECT LOCATION:

Naval Weapons Station Seal Beach (NWSSB) Detachment Fallbrook, Fallbrook, CA, 92028

BID DUE DATE:

08-29-2025 at 02:00 PM

OUTREACH COORDINATOR:

Brenda Martinez

TELEPHONE:

909-622-2259

FAX:

Not Available

ADDRESS:

1383 South Signal Dr., Pomona, CA, 91766

PROJECT DETAILS:

Estimated Project Value: $500,000

Project Scope:

This is a Design-Build construction project.
The project site is located in Naval Weapons Station Seal Beach Detachment Fallbrook, California
(address 700 Ammunition Road, Fallbrook, CA 92028). There is a parking lot located south of Building 380 that serves as the main parking for government/civilina employees. A concrete stairway serves as the access pathway from the parking lot to the walkway leading to Building 380.

The objectives for the Base Bid scope of work includes: 
1) Reestablish bearing below concrete stairs/approach slabs so that the stairs/slabs are safe to walk on. Currently there are voids underneath the stairs due to erosion and rodent burrowing. Applying Polyurethane Foam is the method to reestablish bearing for the concrete stairs/approach slabs. 
2) Protect stairs against future rodent burrowing and erosion that would undermine stairs/slabs
3) Prevent sedimentation on walkways leading from concrete stairs to Building 380
4) Install new solar lighting and handrail loops/painting.

The objectives for the Options scope of work includes: 
1) Placing erosion protection in/on an erosion gully in the slope close to the parking lot.
2) Cleanout and inspect a storm drain, which consist of a conduit with multiple catch basin and terminates at an outlet culvert. 
 

Assistance will be available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials or related technical assistance. Reyes Construction, Inc. is signatory to the following unions: Teamsters, Operators, Cement Masons, Carpenters and Laborers.

 

For information on the availability of scope of work, plans, and specifications, please contact our office. 

Plans, Specifications, and Contract requirements can be viewed at no additional cost:

  1. Via iSqFt – please send an email request to estimating@reyesconstruction.com
  2. In person at Reyes Construction Headquarters (please email for appointment) 

Please e-mail Questions and Quotes to: Estimating@reyesconstruction.com

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.