is seeking certified and qualified DBE, HUD Section 3, MBE, SBE and WBE subcontractors and/or suppliers to provide Concrete, Asphalt, Trucking, Disposal
Pacific Park/Edison ES Artificial Turf Replacement Project
Specification No. 4016R
City of Glendale
501 S. Pacific Ave,, Glendale, CA, 91204
08-21-2025 at 02:00 AM
Ethel Montano
619-278-8824
619-278-8761
8884 Jurupa Road, Jurupa Valley, CA, 92509
PROJECT DETAILS:
Ohno Construction invites your firm to submit a bid for the following project:
Pacific Park/Edison ES Artificial Turf Replacement Project
City of Glendale Specification No. 4016R
Project Description:
Work to include, but limited to, the removal and replacement of synthetic turf with new synthetic turf, infill, and pad; grading of existing base material and new drainage improvements, new concrete paving, temporary asphalt paving.
Location: 501 S. Pacific Ave, Glendale, CA 91204
RFI: Please send questions to estimating@ohnoconstruction.com by August 13th @ 2:00pm
Schedule of Work:
Estimated Start: October 20th 2025
Substantial Completion: 60 Calendar Days from NTP
Final Completion: 90 Calendar Days from NTP
BID DUE DATE & TIME Wednesday, August 20th, 2025 @ 2:00 PM**
Proposals may be emailed to the Estimating Department at estimating@ohnoconstruction.com or faxed to 619-278-8761. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.
**Actual bid date is Thurs., August 21st @2:00pm. We like to request bids a day early to ensure there is time for questions and data entry.
BID DOCUMENTS:
Bid documents are available for download from our website. Please note to manually type in the information. Copy & paste doesn't always work. To access these documents:
https://ohno.sharefile.com/home/shared/fo4084f0-34aa-4b19-bb4b-c1bd3918035b
Enter Email: ohnocc.ca@gmail.com
Enter Password: Yosh1966*
Bid documents are provided for your reference only. All takeoff quantities provided by Ohno Construction are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote.
STANDARD REQUIREMENTS:
By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/Addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2%. The surety must be a California admitted surety. Insurance must name Ohno as additionally insured and be in an amount required by the specifications.