Compliance News Logo
The Latest Project Opportunities for DBE/SBE/DVBE
Live Bid Search
Find the Prime Contractors that need you.
Try typing in your specialty (ie. roofing, painting, or electrical)

Project Details

Thompson Builders Corporation is seeking certified and qualified
DBE subcontractors and/or suppliers to provide:
DIVISION 02 -EXISTING CONDITIONS 02 41 19 SELECTIVE DEMOLITION DIVISION 03 -CONCRETE 03 01 00 MAINTENANCE OF CONCRETE 03 11 00 CONCRETE FORMING 03 20 00 CONCRETE REINFORCING 03 30 00 CAST-IN-PLACE CONCRETE 03 60 00 GROUTING 03 70 00 MASS CONCRETE DIVISION 05 -METALS 05 05 00 COMMON WORK RESULTS FOR METALS 05 05 19 POST-INSTALLED CONCRETE ANCHORS 05 12 00 STRUCTURAL STEEL FRAMING 05 13 00STRUCTURAL STAINLESS STEEL 05 50 00 METAL FABRICATIONS DIVISION 06 -WOODS, PLASTICS, COMPOSITES 06 10 00 ROUGH CARPENTRY DIVISION 07 - THERMAL ANDMOISTURE PROTECTION 07 52 16 SBS MODIFIED BITUMINOUS MEMBRANE ROOFING 07 62 00 SHEET METAL FLASHING AND TRIM 07 72 00 ROOF ACCESSORIES 07 80 00 FIRE AND SMOKE PROTECTION 07 84 13 THROUGH-PENETRATION FIRESTOPPING 07 92 00 JOINT SEALANTS DIVISION 09 - FINISHES 09 29 00 GYPSUM BOARD 09 51 23 ACCOUSTICAL TILE CEILINGS 09 91 00 PAINTING 09 91 23 INTERIOR PAINTING 09 96 00 HIGH PERFORMANCE COATINGS DIVISION 14 - CONVEYING EQUIPMENT 14 01 20.71 ELECTRIC TRACTION PASSENGER ELEVATOR MODERIZATION DIVISION 22 - PLUMBING 22 04 00 GENERAL REQUIREMENTS FOR PLUMBING 22 05 00 COMMON WORK RESULTS FOR PLUMBING 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 05 48 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT 22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 07 00 PLUMBING INSULATION 22 10 00 PLUMBING PIPING 22 13 00 FACILITY SANITARY SEWERAGE 22 45 33 COMBINATION EMERGENCY FIXTURE UNITS 22 45 36 EMERGENCY FIXTURE WATER-TEMPERING EQUIPMENT DIVISION 23 - HVAC 23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING 23 04 00 GENERAL REQUIREMENTS FOR HVAC 23 05 00 COMMON WORK RESULTS FOR HVAC 23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC 23 31 00 HVAC DUCT AND CASINGS 23 31 05 NON-METAL DUCT 23 34 00 HVAC FANS 23 81 26 SPLIT SYSTEM AIR-CONDITIONERS DIVISION 25 - INTEGRATED AUTOMATION 25 15 00 INSTALLATION OF DB-126 FURNISHED EQUIPMENT DIVISION 26 - ELECTRICAL 26 04 00 GENERAL REQUIREMENTS FOR ELECTRICAL 26 04 01 ELECTRICAL DEMOLITION AND MODIFICATIONS 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL 26 05 13 MEDIUM VOLTAGE CABLES 26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33.26 PVC COATED GALVANIZED RIGID STEEL (PGRS) CONDUIT AND SYSTEM COMPONENTS 26 05 43 UNDERGROUND DUCTS AND RACEWAY FOR ELECTRICAL SYSTEMS 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 73 SHORT CIRCUIT / COORDINATION STUDY / ARC FLASH HAZARD ANALYSIS 26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS 26 09 13 ELECTRICAL POWER MONITORING AND CONTROL 26 09 23 LIGHTING CONTROLS 26 12 16 SECONDARY SUBSTATION TRANSFORMERS 26 24 19 MODIFICATION OF EXISTING LOW VOLTAGE MOTOR CONTROL CENTERS 26 24 19.11 LOW VOLTAGE INTELLIGENT MOTOR CONTROL CENTERS 26 27 00 LOW VOLTAGE DISTRIBUTION EQUIPMENT 26 27 26 WIRING DEVICES 26 28 00 MOTOR CIRCUIT PROTECTORS 26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 26 28 16.11 MOLDED CASE CIRCUIT BREAKERS 26 29 13 ENCLOSED CONTROLLERS 26 29 20 UPGRADING DRY WEATHER PUMPS VARIABLE FREQUENCY DRIVES 26 33 53 UNINTERRUPTIBLE POWER SUPPLY 26 36 13.5 NON-AUTOMATIC TRANSFER SWITCH 26 43 13 SURGE PROTECTIVE DEVICES 26 50 00 INTERIOR LIGHTING 26 56 00 EXTERIOR LIGHTING 26 70 00 ELECTRICAL EQUIPMENT ACCEPTANCE TESTING AND STARTUP DIVISION 27 - COMMUNICATIONS 27 01 00 NETWORK CABLE DIVISION 28 - ELECTRONIC SAFETY AND SECURITY 28 31 00 FIRE DETECTION AND ALARM DIVISION 31 - EARTHWORK 31 23 00 EXCAVATION AND FILL 31 23 19 DEWATERING 31 23 33 TRENCHING AND BACKFILLING 31 62 16 TORQUE DOWN PILES DIVISION 32 - EXTERIOR IMPROVEMENTS 32 11 23 AGGREGATE BASE COURSES 32 12 16 ASPHALT PAVING 32 13 13 CONCRETE PAVING DIVISION 33 - UTILITIES 33 01 30.73 CURED-IN-PLACE LINER PIPE 33 33 00 SANITARY SEWERAGE UTILITIES DIVISION 40 - PROCESS INTERCONNECTIONS 40 05 00 GENERAL MECHANICAL REQUIREMENTS 40 05 01 BASIC MECHANICAL MATERIALS AND METHODS 40 05 23 STAINLESS STEEL PROCESS PIPE AND TUBING 40 05 25 FABRICATION OF STEEL PIPE 40 05 53 VALVES 40 05 57 ACTUATORS FOR PROCESS VALVES AND GATES 40 05 96 VIBRATION AND SEISMIC CONTROLS FOR PROCESS EQUIPMENT 40 06 00 IDENTIFICATION FOR PROCESS EQUIPMENT 40 16 42 CHEMICAL PIPING 40 16 43 CHEMICAL VALVES 40 23 00 PROCESS PIPING 40 61 21 PROCESS AND FACILITY CONTROL SYSTEM TESTING 40 61 93 DISTRBUTED CONTROL SYSTEM INPUT OUTPUT DATA 40 70 00 INSTRUMENTATION FOR PROCESS SYSTEM 40 71 00 MAGNETIC FLOW METERS 40 90 00 COMMON WORK RESULTS OF INSTRUMENTATION AND CONTROL SYSTEMS (ICS) 40 94 31 CONTROL PANEL CONSTRUCTION 40 96 25 EXSITING CONTROL STRATEGIES 40 96 30 UPGRADED NSS CONTROL STRATEGIES 40 96 35 SPECIFIC EQUIPMENT CONTROL STRATEGY DIVISION 41 -MATERIAL PROCESSING AND HANDLING EQUIPMENT 41 22 23.19 MONORAIL HOISTS 41 24 26 HYDRAULIC POWER SYSTEMS DIVISION 42 -PROCESS HEATING, COOLING AND DRYING EQUIPMENT DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT 43 21 20 CHEMICAL METERING PUMPS AND APPURTENANCES 43 23 00 LIQUID PUMPS 43 25 00 SUBMERSIBLE/IMMERSIBLE LIQUID PUMPS 43 32 69 CHEMICAL FEED SYSTEMS 43 41 16 CHEMICAL STORAGE TANKS AND APPURTENANCES DIVISION 46 - WATER AND WASTEWATER EQUIPMENT 46 21 16 FLEXIBLE RAKE BAR SCREENS

for project:
SFPUC - WW-685R Northshore Pump Station

San Francisco, CA
94105

Bid Due: Thursday, Nov 19, 2020 at 02:00 PM PST
Solicitation Number: N/A

Please submit bids to us by noon on bid day. *No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers' Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors' faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder's Exchanges, in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato, Monday through Friday from 7:30 AM to 4:00 PM. Plans and specifications may be emailed upon request or downloaded from the following link: https://tpcorp.box.com/s/aend04d9fzmacsc5wbjqrr0odn8ph7fc Thompson Builders Corporation is an Equal Opportunity Employer Contact: Shannon Miller PHONE: (415) 456-8972 FAX: (415) 459-0665 EMAIL: bids@tbcorp.com

Thompson Builders Corporation

Prime Logo

Contact

Shannon Miller, Bid Assistant
5400 Hanna Ranch Road
Novato, CA
94945

Telephone: (415) 456-8972
Fax: (415) 459-0665
Home Page
Published: Friday, Oct 16, 2020 at 09:14 PM PST