Compliance News Logo
The Latest Project Opportunities for DBE/SBE/DVBE
Live Bid Search
Find the Prime Contractors that need you.
Try typing in your specialty (ie. roofing, painting, or electrical)

Project Details

Balfour Beatty Infrastructure, Inc. is seeking certified and qualified
DBE,MBE,WBE subcontractors and/or suppliers to provide:
Schedules, Geotechnical Data, Field Engineering (Survey), Video/Photograph Progress Doc., QA/QC, Temporary Facilities, Equipment Rental, Aggregate, Cement, Hazardous Material Removal, Offsite Transportation & Disposal (Truckers), Groundwater Treatment System, Demolition, Site Clearing, Tree Removal, Dewatering, Shoring and Underpinning (Earth), Ancho Tiebacks/Reinforced Earth, Slope Protection, Erosion Control & HDPE Liners, Earthwork, Soil Stabilization, Caisson (CIDH), Site Concrete, Sanitary Sewage, Drainage & Containment, Fuel Distribution, Flexible Pavement - Asphalt (AC), Paving Specialties, Fences and Gates, Traffic Signs & Signals, Landscaping (Planting & Irrigation), Ready Mix, Concrete Forms & Accessories, Forming Subs (including Scaffolding), Architectural CIP Concrete Form (Formliners), Waterstop, Reinforcing Steel, Concrete Pumping & Special Placement, Precast Concrete, Concrete Drilling, Sawcutting & Coring, Miscellaneous Metals, Structural Steel, Structural Steel Erection, Metal Deck, Handrails & Railing, Grating, Rough Carpentry, Traffic Striping, Thermal Protection (Insulation), Flashing & Sheet Metal, Sheet Metal Roofing, Caulking, Joint Seal, Doors, Floor Access, Doors, Hatches, Overhead Door, Window (Glass & Glazing), Gypsum Board - Drywall - Metal Studs, Paints, Coating & Waterproofing, Specialties, Compartments & Cubicles, Louvers & Vents, Fire Extinguishers & Cabinet, Canopies, Process Equipment, Generators, Special Construction, Cathodic Protection, Pre-Engineered Structure, Hoists & Cables, Mechanical, Coupling, FCA, Flex, Ball Joints, Bolts, Nuts & Gaskets (BNG), Small Bore Pipe, Fabricated Steel Pipe, Plastic Pipe & Valves, C900/C905, HDPE, Ductile Iron Pipe, Miscellaneous Valves, Ball Valve, Butterfly Valve, Check Valve, Gate Valve, Globe Valve, Plug Valve, Pipe Support, Pipe Insulation, Fire Protection Piping, Fire Protection Monitoring System, Plumbing, HVAC, FRP Duct, Electrical, Instrumentation, Traffic Control, Pre-Fabricated Pedestrian Bridges, Stainless Steel Pipe, Skylights..

for project:
City of Brentwood - Brentwood Wastewater Treatment Plant Expansion Ph.2

Brentwood, CA
94513

Bid Due: Tuesday, Mar 17, 2020 at 02:00 PM PST
Solicitation Number: 592-59140

Balfour Beatty Infrastructure, Inc. is bidding as a Prime contractor and encourages all qualified Subcontractors and Suppliers to submit quotations for the following project. Balfour Beatty is a Union Contractor and Subcontractors must abide by the terms and conditions of the applicable Prevailing Wages. This project has DBE, MBE, WBE goals and prospective bidders must be certified by bid opening. Project Description: Brentwood Wastewater Treatment Plant Expansion - Ph.2 Project Location: Brentwood, CA Owner: City of Brentwood Contract No.: 592-59140 Bid Date: Prime Contractors: Tuesday, March 17th, 2020 at 2:00pm Subcontractors: Scope Letters due: Thursday, March 12th at 2:00pm Quotes due: Monday, March 16th at 2:00pm This is a design-bid-build project and subcontractor scopes must be based on the General/Special Provisions, and the Project Definition and Reference Documents provided. It is recommended that interested subs contact Balfour Beatty Infrastructure well ahead of the due date to discuss scope and quantities. PLANS & SPECIFICATIONS: Project Bid Documents may be obtained from the Project Owner or you may view them at BBII's office by appointment. For your convenience, you may also view and download plans by following this link maintained by BBII: https://securecc.smartinsight.co/#/PublicBidProject/497656 Subcontractors and Suppliers are responsible for reading and acknowledging all Specifications and Addenda. BONDING & INSURANCE: Please see Bid Documents for bonding and insurance requirements. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract, by an admitted surety subject to approval by BBII. Bonding cost assistance is available. Subcontractors should expect to sign the standard BBII subcontract agreement and provide a waiver of subrogation. Please contact BBII at (707) 227-8500 for bonding and other types of assistance. QUESTIONS: For questions regarding the bid, please contact Erik Golub at (707) 227-8500 , fax: (877) 763-4002, email: ewr@balfourbeattyus.com, or in writing to: 5050 Business Center Drive, Suite 250, Fairfield, CA 94534. Quotations must be valid for the same duration as specified by the Owner for contract award. Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is required one week prior to bid deadline, to allow proper evaluation. To assist DBE Subcontractors and Suppliers, we will divide total scopes into smaller tasks or quantities, and if necessary, adjust schedules to permit maximum participation by DBE firms. Subcontractors are required to indicate all lower-tier DBE participation offered on their quotation. Balfour Beatty Infrastructure, Inc. is an Equal Opportunity Employer & A Union/Prevailing Wage Contractor, License No. 664318

Balfour Beatty Infrastructure, Inc.

Contact

Eric Golub
5050 Business Center Drive, Suite 250
Fairfield, CA
94534

Telephone: (707) 427-8909
Fax: (877) 763-4002
Published: Thursday, Feb 13, 2020 at 08:44 PM PST