Compliance News Logo
The Latest Project Opportunities for DBE/SBE/DVBE
Live Bid Search
Find the Prime Contractors that need you.
Try typing in your specialty (ie. roofing, painting, or electrical)

Pick a date using the following form and click on the Find button to find all Ads posted in a given month.

272 Ads Total. Next 20

Project Details

SBS Corporation is seeking certified and qualified
DVBE subcontractors and/or suppliers to provide:
The project scope includes interior and exterior painting in Buildings B, C, D and E; site improvements, underground sewer from Bldg. A to main point of connection, and a partial modernization of Bldg. A. Project to be coordinated with previous Demolition and Abatement project.

for project:
Rowland Unified School District - RINCON IS (TELESIS ACADEMY): Partial Modernization Bldg. A/Kindergarten Student Drop-Off & Playground
2800 E. Hollingworth St.
West Covina, CA
91792

Bid Due: Thursday, Feb 23, 2012 at 02:00 PM PST
Solicitation Number: 2011/12:7

SBS is an Equal Opportunity Employer. We will require that all participating companies carry Workers' Compensation & Liability Insurance and be bonded. Will assist with obtaining insurance, bonds or lines of credit. Plans & specifications available for viewing at 31416 Agoura Rd., Ste. 135, Westlake Village, CA 91361 between 9am-5 pm, Mon-Fri or in our online plan room at www.sbscorp.us.

SBS Corporation

Contact

David Alatorre
31416 Agoura Rd., Ste. 135
Westlake Village, CA
91361

Telephone: (818) 597-4363
Fax: (818) 597-4368
Home Page
Published: Tuesday, Jan 31, 2012 at 03:20 PM PST

Project Details

SBS Corporation is seeking certified and qualified
DVBE subcontractors and/or suppliers to provide:
Renovation of approx 7,560 SF existing team locker rooms within the Pyramid, an indoor multi-purpose stadium for the California State University, Long Beach, includes the renovation of team locker rooms, lounges, showers and restrooms.

for project:
California State University, Long Beach - Pyramid Locker Room Renovation
1250 Bellflower Blvd.
Long Beach, CA
90840

Bid Due: Wednesday, Feb 08, 2012 at 02:00 PM PST
Solicitation Number: 073110SP079

SBS is an Equal Opportunity Employer. We will require that all participating companies carry Workers' Compensation & Liability Insurance and be bonded. Will assist with obtaining insurance, bonds or lines of credit. Plans & specifications available for viewing at 31416 Agoura Rd., Ste. 135, Westlake Village, CA 91361 between 9am-5 pm, Mon-Fri or in our online plan room at www.sbscorp.us.

SBS Corporation

Contact

David Alatorre
31416 Agoura Rd., Ste. 135
Westlake Village, CA
91361

Telephone: (818) 597-4363
Fax: (818) 597-4368
Home Page
Published: Tuesday, Jan 31, 2012 at 03:17 PM PST

Project Details

USS CAL BUILDERS INC. is seeking certified and qualified
SBE subcontractors and/or suppliers to provide:
SITE WORK (DEMO, SITE SANITARY SEWER SYSTEMS, SITE CONCRETE WORK, PLANTING); CONCRETE; WOOD AND PLASTICS (ROUGH CARPENTRY, ARCHITECTURAL WOODWORK); DOORS AND WINDOWS (HOLLOW METAL DOORS AND FRAMES, ALUMINUM WINDOWS); FINISHES (METAL SUPPORT ASSEMBLIES, GYPSUM WALL AND CEILING BOARD, ACOUSTICAL CEILING SYSTEM, RESILIENT SHEET FLOORING, PAINTING AND COATINGS); SPECIALTIES; MECHANICAL; PLUMBING; ELECTRICAL; LOW VOTAGE SYSTEMS; MODULAR BUILDERS

for project:
DEVELOPMENT AND CONSTRUCTION OF FREMONT HIGH SCHOOL CLINIC
7281 SOUTH AVALON BLVD
LOS ANGELES, CA
90003

Bid Due: Wednesday, Feb 01, 2012 at 01:00 PM PST
Solicitation Number: R-12017

We are an Equal Opportunity Employer. We will assist with obtaining insurance, bonds or lines of credit. Plans & specifications are available for viewing at our offices. The subcontractor, at its sole cost and expense, is required to furnish to the prime contractor, within five business days of award of the project to USS, payment and performance bonds in the amount of the subcontract issued by an admitted surety wherein the prime contractor shall be named the obligee, guaranteeing prompt and faithful performance of the subcontract and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract. The prime contractor may reject the bid and make a substitution of another subcontractor subject to Section 4107 if the Subcontractor fails to meet this requirement. Conditions, qualifications, exclusions or exceptions to the bond requirement contained in a subcontractor’s bid are not enforceable. USS Cal is relying on the price submitted in a subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of any qualifying language in the proposal. USS Cal’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions or exceptions included in the subcontractor’s bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor’s bid must remain valid with the owner, as specified in the project’s specifications. Each listed subcontractor must execute USS Cal’s standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal’s website and at USS Cal’s office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. USS Cal Builders Inc. is signatory to the Laborer’s Union and to the Carpenter’s Union. Any subcontractor performing carpentry work must be signatory to the Carpenter’s Union and any subcontractor performing Labor Work must be signatory to the Labor Union. This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.

USS CAL BUILDERS INC.

Prime Logo

Contact

VINCIE ABROT
8051 Main Street
Stanton, CA
90680

Telephone: (714) 828-4882
Fax: (714) 828-9498
Home Page
Published: Tuesday, Jan 31, 2012 at 03:15 PM PST

Project Details

Contri Construction Company is seeking certified and qualified
DVBE,DBE,MBE,WBE,SBE,UDBE,OBE subcontractors and/or suppliers to provide:
Trucking, Structural Steel, Welding, Painting, Metal Buildings, Concrete Reinforcement, Precast Concrete, Steel Doors and Frames, Fire Protection Services, Safety Equipment, HVAC, Drywall, Pipe, Valves and Fittings, AC Paving, Fencing Hydroseeding

for project:
City of Turlock Harding Drain Bypass Pump Station & Pipeline Project
156 South Broadway
Turlock, CA
95380

Bid Due: Tuesday, Feb 14, 2012 at 05:00 PM PST
Solicitation Number: WQCF-6859

We are an Equal Opportunity Employer.

Contri Construction Company

Contact

Gary Bedell
PO Box 97739
Las Vegas, NV, NV
89193

Telephone: (702) 458-6004
Fax: (702) 458-7746
Published: Tuesday, Jan 31, 2012 at 12:49 PM PST

Project Details

Shasta Constructors, Inc. is seeking certified and qualified
DBE,WBE,UDBE subcontractors and/or suppliers to provide:
Shasta Constructors, Inc. is seeking qualified subcontractors and/or suppliers including those certified and qualified UDBEs to provide material and/or sub quotes for bid items including, but not limited to: Bridge Removal, Clearing and Grubbing, Lead Compliance Plan, Relocate Roadside Signs, Imported Borrow (Temp Road_, Aggregate Base (Temp Road), 18" CMP culvert, Erosion Control Type D, Aggregate Base (Class 2), Hot Mix Asphalt (3/4" Type A), Construction Staking, Thermo Traffic Stripe, Bar Reinforcing Steel (Bridge), 8: PPP Abutment Underdrain, Facing RSP, Misc. Metal (Bridge), Fence (Type BW 5 strand), Guard Rail Transition (Type WB), Terminal System (Type SRT), trucking, and misc. construction supplies.

for project:
County of Yuba Department of Public Works SMARTSVILLE ROAD BRIDGE REPLACEMENT AT VINEYARD CREEK F.A.P. No.: BRLS-5916(065) Contract No. : 2012-6012
Smartsville Road
Smartsville, CA
95977

Bid Due: Tuesday, Feb 21, 2012 at 02:00 PM PST
Solicitation Number: 2012-6012

Plans and specifications may be reviewed in our office, or purchased from the office of Public Works, 915 8th Street, Suite 125, Marysville, CA 95901, phone number (530) 749-5420 for a non-refundable fee of $50 (+$5 if mailed) per set. If you require assistance in obtaining bonding, insurance, or lines of credit, necessary equipment, supplies and materials or have any questions in connection with the project including information about the plans, specifications and requirements of the contract, please contact Jan Lusso at extention 27 or Selene Edwards at extension 28. We are an equal opportunity employer and will consider all bids submitted. We especially encourage firms certified as UDBE by Caltrans to submit bids. If you are interested in this project we are more than willing to discuss in detail what assistance we can provide you. All Subcontractors shall be prepared to submit faithful performance and payment bonds equal to 100% of their quotation. Shasta will pay only standard industry rates for these bonds. Subcontractors must possess current insurance and worker's compensation coverage. Please contact Shasta for assistance in responding to this solicitation. Shasta's listing of a Subcontractor in its bid to the public agency is not to be construed as an acceptance of all of the Subcontractor's conditions or exceptions included with Subcontractor's price quotes. All bids received will be considered.

Shasta Constructors, Inc.

Prime Logo

Contact

Selene Edwards
P.O. Box 491539
Redding, CA
96049

Telephone: (530) 365-3930
Fax: (530) 365-5465
Home Page
Published: Tuesday, Jan 31, 2012 at 12:17 PM PST

Project Details

MGE Underground is seeking certified and qualified
WBE,UDBE subcontractors and/or suppliers to provide:
Trucking, A.C., Class 2 base, sand, precast concrete (headwall), concrete structures, paving, erosion control, highway planting, striping, paving

for project:
STATE OF CALIFORIA DEPARTMENT OF TRANSPORTATION FOR CONSTRUCTION ON STATE HIGHWAY IN MONTEREY COUNTY ABOUT 9.0 MILES SOUTH OF GORDA AT SILVER SPUR CREEK IN DISTRICT 05 ON ROUTE 1
ON STATE HIGHWAY IN MONTEREY COUNTY ABOUT 9.0 MILES SOUTH OF GORDA AT SILVER SPUR CREEK IN DISTRICT 05 ON ROUTE 1
GORDA, CA
93920

Bid Due: Tuesday, Feb 14, 2012 at 02:00 PM PST
Solicitation Number: 05-493704

MGE Underground is an equal opportunity employer. Performance and Payment Bonds may be required. MGE will pay Premium up to 1.5% of bid amount and at our sole discretion, reserve the right to waive the requirement of such bond, to permit substitute security or to accept alternate guarantee in lieu of such bond. Plans and specifications are online @ our website (www.mgeunderground.com) or available by appointment for review/takeoff at above address.

MGE Underground

Prime Logo

Contact

Estimator
Post Office Box 4189
Paso Robles, CA
93447

Telephone: (805) 238-3510
Fax: (805) 238-1975
Home Page
Published: Tuesday, Jan 31, 2012 at 12:10 PM PST

Project Details

C.W. Roen Construction Company is seeking certified and qualified
DBE,MBE,WBE subcontractors and/or suppliers to provide:
the following scopes of work but not limited to: Concrete: Forming, Waterstops, Reinforcing, Cast-in-Place, Finishing, Curing, Precast Concrete Specialties, Non-Shrink Grouting. Metals: Hot-Dip Galvanizing, Pipe Welding, Flange Bolting, Structural Steel Framing, Steel Decking, Metal Fabrications. Finishes: Acoustical Panels, Painting, Zinc-Rich Coatings, High-Build Epoxy Coatings, Fusion-Bonded Epoxy Coating, Mechanical & Electrical Coating. Electrical: Electrical Systems, Low Voltage Motors, Monitoring and Control, Lighting Control Devices, Switchboards, Panelboards, Wiring Devices, Fuses, Interior Lighting (Fixtures, Lamps, Ballasts), Emergency Lighting. Utilities: Instruments and Recorders, Fabricated Pipe Specials, Installation of Steel Piping, Polywrap, Valves, Vertical Turbine Pumps, Strainers and Filters, Piping, Process Integration: Mechanical Piping, Programmable Logic Process Controllers, Process Control (Panels & Hardware, Networks, Network Cables, Software Architecture, Software Programming). Earthwork: Clearing & Grubbing, Excavation, Dewatering, Fill, Imported Backfill & Drain Rock Materials, Controlled Density Fill, Trenching and Backfilling, Drilled Shafts and Soldier Piles. Exterior Improvements: Asphalt Paving, Chain Link Fence & Gates, Wire Fences & Swing Gates, Hydraulic Seeding. Miscellaneous: Demolition, Misc Rough Carpentry, Glass-Fiber-Reinforced Plastic, Waterproofing, Joint Sealants, Roof Hatches, Door Hardware, Louvers, Shop Desk, Pipe & Equipment ID, Communication Systems, Intrusion Detection Remote Devices & Sensors, Metal Ducts, Air Duct Accessories, HVAC Fans, Fan Coil Units.

for project:
East Bay Municipal Utility District - Round Hill No. 2 Pumping Plant

Alamo, CA
94607

Bid Due: Wednesday, Feb 15, 2012 at 01:30 PM PST
Solicitation Number: n/a

WE ARE AN EQUAL OPPORTUNITY EMPLOYER AND SERIOUSLY INTEND TO CONDUCT NEGOTIATIONS WITH MBE, WBE, DBE FIRMS. Plans and Specifications are available for paper or electronic copy by contacting Brian Stansell at (925) 837-5501, Ext. 114. Worker's Compensation & Liability Insurance as well as 100% Performance and Payments Bonds will be required for this project to be issued by an admitted treasury listed corporate surety acceptable to GC. We will provide assistance with obtaining insurance, bonds or lines of credit. For any other questions please contact Sandra G. at (925) 837-5501, Ext. 101 or sguardado@cwroen.com

C.W. Roen Construction Company

Contact

Brian Stansell (ext. 114)
P.O. Box 4
Danville, CA
94526

Telephone: (925) 837-5501
Fax: (925) 837-2674
Home Page
Published: Tuesday, Jan 31, 2012 at 11:54 AM PST

Project Details

MGE Underground is seeking certified and qualified
WBE,UDBE subcontractors and/or suppliers to provide:
Trucking, A.C., Class 2 base, sand, precast concrete (headwall), concrete structures, paving, erosion control, highway planting, striping, paving

for project:
State of California Department of Transportation For construction on state highway in Monterey County aboout 10.0 miles south of Gorda at Pepperwood Gulch in District 05 on route 1
on state highway in Monterey County aboout 10.0 miles south of Gorda at Pepperwood Gulch in District 05 on route 1
Gorda, CA
93920

Bid Due: Wednesday, Feb 15, 2012 at 02:00 PM PST
Solicitation Number: 05-0R8104

MGE Underground is an equal opportunity employer. Performance and Payment Bonds may be required. MGE will pay Premium up to 1.5% of bid amount and at our sole discretion, reserve the right to waive the requirement of such bond, to permit substitute security or to accept alternate guarantee in lieu of such bond. Plans and specifications are online @ our website (www.mgeunderground.com) or available by appointment for review/takeoff at above address.

MGE Underground

Prime Logo

Contact

Estimator
Post Office Box 4189
Paso Robles, CA
93447

Telephone: (805) 238-3510
Fax: (805) 238-1975
Home Page
Published: Tuesday, Jan 31, 2012 at 11:16 AM PST

Project Details

Sully-Miller Contracting Company is seeking certified and qualified
DBE,UDBE subcontractors and/or suppliers to provide:
CLEARING & GRUBBING, CONCRETE STRUCTURES & REBAR, ELECTRICAL CONDUCTS, FENCING, GRINDING, GUARD RAIL, HYDROSEED, LANDSCAPE & IRRIGATION, LOOPS, RIP-RAP, STRIPING & MARKING, SWPPP, TRUCKING, MATERIALS, AND RENTAL EQUIPMENT

for project:
CITY OF MORENO VALLEY CACTUS AVENUE / NASON STREET IMPROVEMENT PROJECT PROJECT NO. 12-12599520

Moreno Valley, CA
92551

Bid Due: Wednesday, Feb 15, 2012 at 10:00 AM PST
Solicitation Number: PROJECT NO. 12-12599520

Sully-Miller Contracting Company An Equal Opportunity Employer License No. 747612A 135 S. State College Blvd., Suite 400, Brea, CA 92821 Phone: (714) 578-9600 FAX: (714) 578-9672 Contact: Estimating Department Plans, specifications and project requirements are available in our office for viewing or may be obtained from the Finance Department, 14177 Frederick Street, Moreno Valley, CA 92552, (951) 413-3130. Sully-Miller is willing to set aside any portion of work, no matter how small to encourage (UDBE/DBE) participation. If you require information regarding assistance in obtaining bonding, insurance, credit, equipment, supplies, materials, or related services, please call our office. 100% Payment and Performance bonds May Be Required

Sully-Miller Contracting Company

Prime Logo

Contact

Vanessa Dhupchinda
135 S. State College Boulevard, Suite 400
Brea, CA
92821

Telephone: (714) 578-9600
Fax: (714) 578-9672
Home Page
Published: Tuesday, Jan 31, 2012 at 11:16 AM PST

Project Details

CalPortland Construction is seeking certified and qualified
UDBE subcontractors and/or suppliers to provide:
ESA Fence, Construction Area Signs, Portable Message Sign, Striping and Marking, Erosion Control, Rock Stain, Structural Concrete Headwalk, HDPE Pipe, Rock Slope Protection

for project:
Caltrans: Install Pipe Culvert and Rock Slope Protection

Gorda, CA
93920

Bid Due: Wednesday, Feb 15, 2012 at 02:00 PM PST
Solicitation Number: 05-0R8104

We are an Equal Opportunity Employer. We will assist you in trying to obtain bonds, lines of credit or insurance. We will further assist you in obtaining necessary equipment, supplies, materials, or related assistance or services. Plans and Specifications are available for review in our office. Please call for an appointment to review and assist in plan take-off/review.

CalPortland Construction

Contact

Wes Nanasy
1625 North Blosser Road
Santa Maria, CA
93454

Telephone: (805) 345-3581
Fax: (805) 345-3538
Home Page
Published: Tuesday, Jan 31, 2012 at 11:01 AM PST

Project Details

CalPortland Construction is seeking certified and qualified
UDBE subcontractors and/or suppliers to provide:
ESA Fence, Water Pollution Control, Traffic Control, Portable Message Sign, Construction Area Signs, Erosion Control, Striping and Marking, Structural Concrete, Rock Slope Protection, Gabion, HDPE Pipe

for project:
Caltrans: Replace Culvert

Gorda, CA
93920

Bid Due: Tuesday, Feb 14, 2012 at 02:00 PM PST
Solicitation Number: 05-493704

We are an Equal Opportunity Employer. We will assist you in trying to obtain bonds, lines of credit or insurance. We will further assist you in obtaining necessary equipment, supplies, materials, or related assistance or services. Plans and Specifications are available for review in our office. Please call for an appointment to review and assist in plan take-off/review.

CalPortland Construction

Contact

Wes Nanasy
1625 North Blosser Road
Santa Maria, CA
93454

Telephone: (805) 345-3581
Fax: (805) 345-3538
Home Page
Published: Tuesday, Jan 31, 2012 at 10:33 AM PST

Project Details

Angeles Contractor, Inc. is seeking certified and qualified
DVBE,DBE,MBE,WBE,SBE,UDBE,OBE,Other subcontractors and/or suppliers to provide:
Div. 2,5,6,7,8,9,15,16

for project:
San Bernardino City USD - HVAC Upgrades at Various High and Middle School Sites - Group B
various
San Bernardino, CA
92405

Bid Due: Friday, Feb 17, 2012 at 12:15 PM PST
Solicitation Number: F11-02

ACI is relying on the price submitted in a subcontractor’s proposal as an all-inclusive price for its trade scope per the plans and specifications regardless of any qualifying proposal language. No substitutions will be accepted. ACI’s listing of a subcontractor is not an acceptance of all or any of that subcontractor’s conditions, qualifications, exclusions or exceptions included in the subcontractor’s bid. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor’s bid must remain valid with the owner, as specified in the project’s specifications. Each listed subcontractor must execute ACI’s standard subcontract agreement if ACI is awarded the project; the standard subcontract is available for review on ACI’s website and at ACI’s office. PLEASE TAKE NOTICE that any subcontractor whose bid is relied upon by ACI must provide 100% performance and payment bonds issued by an admitted surety in an amount not less than its bid amount; the expense of the bonds is to be borne by the subcontractor. The bonds must guarantee prompt and faithful performance of the subcontract and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract. Conditions, qualifications, exclusions or exceptions to the bond requirements contained in a subcontractor’s bid are not enforceable. Such bonds must be furnished to ACI within five (5) business days of the project being awarded to ACI. ACI, at its sole discretion, reserves the right to waive the requirements of such bonds, but only in a writing signed by ACI. At the discretion of ACI, any listed subcontractor that withdraws its bid after ACI submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Note that ACI is a signatory to the Carpenters and Painters unions; subcontractors must adhere to provisions of the applicable Master Labor Agreement(s) applicable to their trade. THIS IS A PREVAILING WAGE PROJECT.

Angeles Contractor, Inc.

Contact

Jorge Topete
8461 Commonwealth Ave.
Buena Park, CA
90621

Telephone: (714) 443-3655
Fax: (714) 443-3293
Home Page
Published: Tuesday, Jan 31, 2012 at 10:27 AM PST

Project Details

Angeles Contractor, Inc. is seeking certified and qualified
DVBE,DBE,MBE,WBE,SBE,UDBE,OBE,Other subcontractors and/or suppliers to provide:
Div. 2,3,5,6,7,8,9,10,15,16

for project:
San Bernardino City Unified School District - HVAC Upgrades at Various High and Middle School Sites - Group A
Various High and Middle School Sites
San Bernardino, CA
92411

Bid Due: Tuesday, Feb 14, 2012 at 12:15 PM PST
Solicitation Number: F11-02

ACI is relying on the price submitted in a subcontractor’s proposal as an all-inclusive price for its trade scope per the plans and specifications regardless of any qualifying proposal language. No substitutions will be accepted. ACI’s listing of a subcontractor is not an acceptance of all or any of that subcontractor’s conditions, qualifications, exclusions or exceptions included in the subcontractor’s bid. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor’s bid must remain valid with the owner, as specified in the project’s specifications. Each listed subcontractor must execute ACI’s standard subcontract agreement if ACI is awarded the project; the standard subcontract is available for review on ACI’s website and at ACI’s office. PLEASE TAKE NOTICE that any subcontractor whose bid is relied upon by ACI must provide 100% performance and payment bonds issued by an admitted surety in an amount not less than its bid amount; the expense of the bonds is to be borne by the subcontractor. The bonds must guarantee prompt and faithful performance of the subcontract and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract. Conditions, qualifications, exclusions or exceptions to the bond requirements contained in a subcontractor’s bid are not enforceable. Such bonds must be furnished to ACI within five (5) business days of the project being awarded to ACI. ACI, at its sole discretion, reserves the right to waive the requirements of such bonds, but only in a writing signed by ACI. At the discretion of ACI, any listed subcontractor that withdraws its bid after ACI submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Note that ACI is a signatory to the Carpenters and Painters unions; subcontractors must adhere to provisions of the applicable Master Labor Agreement(s) applicable to their trade. THIS IS A PREVAILING WAGE PROJECT.

Angeles Contractor, Inc.

Contact

Jorge Topete
8461 Commonwealth Ave.
Buena Park, CA
90621

Telephone: (714) 443-3655
Fax: (714) 443-3293
Home Page
Published: Tuesday, Jan 31, 2012 at 10:22 AM PST

Project Details

Lillibridge Healthcare Services is seeking certified and qualified
DVBE subcontractors and/or suppliers to provide:
full upgrade of the fire alarm system including the fire alarm panel, devices and installation of a new remote annunciator panel, utilizing the existing wiring as applicable. Project to include a 5 year parts and 1 year labor warranty. Please contact Lillibridge for full scope of work and other bid specifications.

for project:
Lillibridge Healthcare Services, Inc. Medical Office Building full upgrade of fire alarm system
8051 S. Emerson Avenue
Indianapolis, IN
46227

Bid Due: Wednesday, Feb 15, 2012 at 01:00 PM PST
Solicitation Number: 01674

We are an Equal Opportunity Employer.

Lillibridge Healthcare Services

Contact

Kurt Goertemiller
8402 Harcourt Road, Suite 601
Indianapolis, IN
46260

Telephone: (317) 872-1016
Fax: (317) 872-1682
Published: Tuesday, Jan 31, 2012 at 08:39 AM PST

Project Details

Whitaker Construction Group, Inc. is seeking certified and qualified
UDBE subcontractors and/or suppliers to provide:
any service or product to complete the bid requirements including but not limited to: Prepare Water Pollution Control Program, Lead Compliance Plan, Erosion Control, Irrigation Systems, Highway Planting & Plant Establishment, Construction Area Signs, Traffic Control, Striping & Pavement Marking and suppliers of Rock Slope Protection, Misc Iron & Steel, Pipe, Channelizers, Temporary Fence (Type ESA), Rock Stain, Class II Aggregate Base, Hot Mix Asphalt, Concrete, Tack Coat, Sand, Imported Borrow, Gabion & Trucking.

for project:
State of California, Department of Transportation - Replace Culvert in Monterey County
About 9.0 Miles South Of Gorda at Silver Spur Creek
BigSur, CA
93920

Bid Due: Tuesday, Feb 14, 2012 at 02:00 PM PST
Solicitation Number: 05-493704

Whitaker Construction Group Inc. is an Equal Opportunity Employer. Bids in excess of $100,000.00 will require a Payment & Performance Bond in the amount of 100% of the Subcontract amount from a California Admitted Surety acceptable to WCGI and not less than AM Best A rating. WCGI may assist with Bonds, Insurance & Credit if needed. See Specifications for individual owner requirements and or liability Insurance. All Subcontractors are required to sign WCGI's standard Subcontract Agreement and provide Waiver of Subrogation. All subcontractors must be certified by the bid/proposal due date and must provide our office with a copy of your UDBE certification with the bid/proposal.

Whitaker Construction Group, Inc.

Contact

Randy Walters
2752 Concrete Court
Paso Robles, CA
93446

Telephone: (805) 226-4020
Fax: (805) 226-4028
Published: Monday, Jan 30, 2012 at 04:36 PM PST

Project Details

Western Rim Constructors, Inc. is seeking certified and qualified
UDBE subcontractors and/or suppliers to provide:
SWPPP Plan, QSP Inspection, Erosion Control, Demolition, Cold Planing of Asphalt, Asphalt, Electrical, Striping, C/L Fence, Metal Beam Guardrail & Signage

for project:
City of San Diego: Skyline Drive Corridor Improvements

San Diego County, CA
92101

Bid Due: Tuesday, Feb 14, 2012 at 02:00 PM PST
Solicitation Number: K-12-5057-DBB-3-C

Please respond by 1:00 pm on February 14, 2012. Western Rim Constructors, Inc. will assist you in obtaining bonding, lines of credit or insurance, and any technical assistance or information related to the plans, specifications and requirements for the work. WRC will also assist interested sub-contractors in obtaining necessary equipment, supplies, material or related assistance or services, excluding supplies and equipment that the sub-contractor purchases or leases from the prime contractor or its affiliate. Plans are available for review in our office: Western Rim Constructors, Inc 912 S. Andreasen Drive, Suite 108 Escondido, CA 92029 (760) 489-4328 (760) 489-4304 fax Plans are also available online free of charge. Please contact our office for assistance obtaining plans online.

Western Rim Constructors, Inc.

Contact

Sandra Roth
912 S. Andreasen Drive, Suite 108
Escondido, CA
92029

Telephone: (760) 489-4328
Fax: (760) 489-4304
Published: Monday, Jan 30, 2012 at 03:31 PM PST

Project Details

Whitaker Construction Group, Inc. is seeking certified and qualified
UDBE subcontractors and/or suppliers to provide:
any service or product to complete the bid requirements including but not limited to: Prepare Water Pollution Control Program, Lead Compliance Plan, Erosion Control, Irrigation Systems, Highway Planting & Plant Establishment, Construction Area Signs, Traffic Control, Striping & Pavement Marking, Rock Slope Protection, Bar Reinforcing Steel, Pipe, Temporary Fence (Type ESA), Rock Stain, Class II Aggregate Base, Hot Mix Asphalt, Concrete, Sand & Trucking.

for project:
State of California, Department of Transportation - Install Pipe Culvert and Rock Slope Protection in Monterey County
about 10 Miles South of Gorda @ Pepperwood Gulch
Big Sur, CA
93920

Bid Due: Wednesday, Feb 15, 2012 at 02:00 PM PST
Solicitation Number: 05-0R8104

Whitaker Construction Group Inc. is an Equal Opportunity Employer. Bids in excess of $100,000.00 will require a Payment & Performance Bond in the amount of 100% of the Subcontract amount from a California Admitted Surety acceptable to WCGI and not less than AM Best A rating. WCGI may assist with Bonds, Insurance & Credit if needed. See Specifications for individual owner requirements and or liability Insurance. All Subcontractors are required to sign WCGI's standard Subcontract Agreement and provide Waiver of Subrogation. All subcontractors must be certified by the bid/proposal due date and must provide our office with a copy of your UDBE certification with the bid/proposal.

Whitaker Construction Group, Inc.

Contact

Randy Walters
2752 Concrete Court
Paso Robles, CA
93446

Telephone: (805) 226-4020
Fax: (805) 226-4028
Published: Monday, Jan 30, 2012 at 03:29 PM PST

Project Details

UNION ENGINEERING COMPANY, INC. is seeking certified and qualified
UDBE subcontractors and/or suppliers to provide:
FENCING, SWPPP, TRAFFIC CONTROL, PAVEMENT MARKING, IRRIGATION, EROSION CONTROL, ASPHALT, REBAR

for project:
STATE OF CA DEPARTMENT OF TRANSPORTATION 05-0R8104 CONSTRUCTION ON STATE HIGHWAY IN MONTEREY COUNTY ABOUT 10.0 MILES SOUTH OF GORDA AT PEPPERWOOD GULCH
STATE HIGHWAY 1
GORDA, CA
93920

Bid Due: Wednesday, Feb 15, 2012 at 02:00 PM PST
Solicitation Number: 05-0R8104

We are an Equal Opportunity Employer. We will require that all participating companies carry Workers' Compensation & Liability Insurance and be bonded. We will assist with obtaining insurance, bonds or lines of credit. Plans & specifications are available for viewing at our offices.

UNION ENGINEERING COMPANY, INC.

Contact

ERNIE FORD
P O BOX 1000
VENTURA, CA
93002-1000

Telephone: (805) 644-3373
Fax: (805) 644-3380
Published: Monday, Jan 30, 2012 at 03:15 PM PST

Project Details

Excel Paving Company is seeking certified and qualified
UDBE subcontractors and/or suppliers to provide:
TRAFFIC CONTROL PLAN, CLEAR & GRUB, PCC MEDIAN CURB, INTERLOCKING PAVERS, WATER BARRIER, WATER SERVICE LATERAL AND METER, PVC CONDUIT, STRIPING, MARKING, MARKERS, TRAFFIC SIGNING, IRRIGATION SYSTEM, TOP SOIL, SYNTHETIC TURF, TREES AND SHRUBS, ROOT BARRIER, MULCH TOPDRESSING, ELECTRICAL AND LIGHTING SYSTEMS,

for project:
City of Brea - Birch St. Median Improvements
Birch St.
Brea, CA
92821

Bid Due: Wednesday, Feb 08, 2012 at 02:00 PM PST
Solicitation Number: RPSTLE 5237 (023)

Engineer's estimate is $1.6 Million. Contract duration is 60 Working Days. THIS PROJECT OF A GOAL OF 8% PARTICIPATION OF UDBE OWNED BUSINESSES. Excel Paving Company is an *EQUAL OPPORTUNITY EMPLOYER* We offer assistance in obtaining bonds, lines of credit, insurance, necessary equipment, supplies and materials, and Plans & Specs at the subcontractor's request. 100% Performance and Payment Bond may be required. Plans and Specifications are available through the City of Brea, 1 Civic Center Circle, Brea, CA 92821. They are also available for review at our office (Please contact us beforehand to ensure they will be available). Excel Paving Company intends to seriously negotiate with qualified subcontractors, suppliers and vendors, particularly UDBE firms to gain their participation. If you contact Excel via email, please refer to the project name in the subject box. Otherwise it may be considered SPAM.

Excel Paving Company

Contact

Carol Castillo
2230 Lemon Ave.
Long Beach, CA
90806

Telephone: (562) 599-5841
Fax: (562) 591-7485
Published: Monday, Jan 30, 2012 at 03:06 PM PST

Project Details

Staples Construction Company, Inc. (Ventura) is seeking certified and qualified
WBE,OBE subcontractors and/or suppliers to provide:
Proposals for scope of work for the construction of New 3,900 SQFT Bldg.

for project:
Boys & Girls Club of Ventura: Boys & Girls Club Saticoy Facility

Ventura, CA
93003

Bid Due: Monday, Feb 06, 2012 at 12:00 PM PST
Solicitation Number: #1053

This is a Prevailing Wage Project. Davis Bacon and State Prevailing Wages Apply. Subcontractors may be required to provide payment and performance bonds. We are an Equal Opportunity Employer.

Staples Construction Company, Inc. (Ventura)

Contact

Marissa Roman
1501 Eastman Avenue
Ventura, CA
93003

Telephone: (805) 658-8786
Fax: (805) 658-8785
Home Page
Published: Monday, Jan 30, 2012 at 02:56 PM PST
272 Ads Total. Next 20